Swimming pool · Landscape
Swimming pool and landscape setting-out plan
Site setting-out plan for a proposed swimming pool, deck and landscaping, with plot limits, safety fence and dimensions.
DUBAI AUTHORITY APPROVALS
Explore a selection of project drawings and documents covering villa alterations, swimming pools, fit-outs and other authority-related work across Dubai.
Swimming pool · Landscape
Site setting-out plan for a proposed swimming pool, deck and landscaping, with plot limits, safety fence and dimensions.
Swimming pool
Site plan locating the as-built swimming pool and underground pump room within a residential plot, with setbacks and ground levels.
Swimming pool
Pool plan with floor levels, main drains, inlets, skimmers and vacuum points, and notes on lighting and electrical protection.
Swimming pool
Underground pump room plan with sections showing the concrete walls, slabs and waterproofing layers.
Structural
Pump room layout with the pump and pipework arrangement, and sections showing reinforcement, blockwork, plaster and waterproofing.
Fit-out · Architectural
Proposed ground-floor partition layout with consultation rooms, reception, waiting area, pantry and staff room.
Fit-out · Architectural
Proposed mezzanine layout with surgery, X-ray, laboratory, pharmacy, preparation and animal care rooms.
Fit-out · Architectural
Sections through the clinic showing the ground floor, mezzanine, clear heights and proposed partitions.
Villa modification · Architectural
Proposed ground-floor layout for the modified villa, with the changed areas clouded for review.
Villa modification · Architectural
Proposed elevations with the modified openings and the kitchen extension clouded for review.
Villa modification · Architectural
Architectural setting-out plan with plot dimensions, building lines and gate levels.
Villa modification · Architectural
Ground-floor plan of the villa row with living, kitchen, study and garage areas for each unit.
Villa modification · Architectural
First-floor bedroom layouts and the roof plan with parapets and roof levels.
Villa modification · Architectural
Elevations of the villa row with floor levels and facade details.
No projects match these filters.
Have a similar project?
Share your project details with our team to discuss the drawings and approvals it needs.
We handle approvals across Dubai's villa communities, business districts and industrial areas. Each guide explains the developer NOC and authority route that usually applies there.