Drawings & design · Buildings

Multi-storey and commercial building design

For landowners and developers planning residential buildings, offices, mixed-use blocks, warehouses and other commercial buildings. We lead the design through concept approval, coordinated engineering and the permit package, with the fire, utility and access requirements built in early.

On a multi-storey building, the expensive mistakes are made early. A core in the wrong place, a car park ramp that doesn't work or a missing substation room can survive months of design and only surface when Civil Defence, DEWA or the RTA reviews the drawings.

Building design for approval is therefore a sequencing exercise as much as a creative one. The plot rules, the fire strategy, the utility rooms and the access arrangements are fixed first, so the architecture develops around requirements rather than colliding with them.

We design residential and mixed-use buildings, offices, showrooms, warehouses and industrial buildings, and prepare the drawings that go to the permit authority. The authority, not us, decides whether to approve. Our job is to give the reviewers a design that is complete, consistent and compliant.

Buildings we design

  • Residential buildings
  • Mixed-use with retail podium
  • Office buildings
  • Showrooms
  • Warehouses
  • Light industrial units
  • Labour & staff accommodation
  • Additions to existing buildings

Dubai Municipality publishes separate building permit procedures for residential villas, for industrial buildings, and for multi-storey and public buildings. The procedure your project follows shapes the document list and inspection stages, so we identify it at the start. Industrial plots, for example, carry soil test and topographic survey requirements in DM's procedures.

Plot rules, jurisdiction and the master plan

The site plan sets the permitted use, gross floor area, height, setbacks and parking basis for the plot. Before massing, we confirm which authority controls it. Most mainland plots are under Dubai Municipality. Plots in DDA zones, Trakhees areas and free zones follow those authorities' procedures and, in some cases, their own regulations alongside the Dubai Building Code, which applies across the emirate.

Longer-term planning policy also matters for larger plots. Our article on the Dubai 2040 Urban Master Plan explains how it frames land use and density.

Design stages and approval points

Feasibility and massing

Plot study, permitted area and height, parking yield and a first massing model. We test whether the brief fits before money is spent on detailed design.

Developer + our team

Concept design and initial approval

For larger projects, Dubai Municipality offers a design-concept initial approval before detailed design. It is a chance to confirm the planning basis before committing to full engineering.

Registered consultant · DM

Developed design across disciplines

Cores, shafts, plant rooms, structural grid and façade strategy are coordinated. The fire strategy, DEWA requirements and vehicle access are fixed here, not later.

Design team

Service-authority input

Civil Defence, DEWA, RTA, drainage and telecoms requirements are reflected in the design and their NOCs or reviews scheduled.

Consultant · service authorities

Permit design package

Full architectural, structural, MEP and fire drawings with calculations, area statements and sustainability inputs, submitted by a registered consultant.

Registered consultant

Comments, permit and construction support

Comments are answered and the permit issued. During construction, inspections at stages such as shoring, foundations and slabs rely on the approved drawings, and the consultant responds to site queries.

Authority · consultant · contractor

Site works can start in stages: Dubai Municipality lists a separate site preparation service for works such as hoarding, shoring and piling. On tight programmes, these drawings can be prepared ahead of the main superstructure package.

What has to be coordinated early

Fire strategy

Escape stairs, travel distances, fire separation, firefighting access and systems drive the core layout. Civil Defence reviews to the UAE Fire and Life Safety Code of Practice. See Civil Defence approvals.

Vertical transport and accessibility

Lift numbers and sizes and accessible routes are governed by Parts C and D of the Dubai Building Code. They decide the size of the core.

Utilities

Electrical rooms, substations where needed, meter rooms, water tanks and drainage routes follow the code's incoming utilities part and DEWA's regulations. See MEP design.

Access and parking

Car park entrances, ramps, loading bays and the plot's connection to the road network may need RTA review. See RTA approvals and infrastructure design.

Envelope and sustainability

New buildings must reach at least Silver Sa'fa under Al Sa'fat. Façade glazing, shading and insulation should be modelled during developed design.

Structure and ground

Soil investigation informs foundations and any basement retention. Transfer structures at podium level should be agreed with the architect before the plan is fixed.

Deliverables

  • Feasibility reportPlot rules, permitted areas, parking yield and a massing study.
  • Concept packagePlans, sections and massing for initial approval or developer review.
  • Architectural permit setPlans for every level, elevations, sections, area statements and schedules.
  • Structural packageFoundation, frame and slab drawings with calculations, and shoring design where excavation needs it.
  • MEP packageElectrical, plumbing, drainage, HVAC and load schedules for utility submissions.
  • Fire and life safety drawingsLayouts and systems for Civil Defence review.
  • Sustainability submission inputsEnvelope calculations and Al Sa'fat compliance details.
  • BIM-ready filesModels and drawings structured for the Building in Dubai platform's automated checks where the submission uses them.

How the building drawings carry through to completion

The permit drawings are not filed and forgotten. They become the reference for every later stage, which is why their accuracy matters well beyond the first approval.

StageHow the approved design is used
Tender and construction drawingsContractors price and build from drawings that must stay consistent with the approved set. Changes that affect the approval, such as a different floor plate or an added floor, need a revised approval before they are built.
Stage inspectionsInspectors compare shoring, foundations, slabs and other stages on site with the approved structural drawings before work continues.
Service connectionsDEWA, Civil Defence and other service authorities test and inspect their systems against the drawings they reviewed.
Completion certificateThe final inspection checks the finished building against the permit. Unapproved deviations have to be regularised first. See completion certificates.
Later modificationsFuture owners and tenants rely on the approved drawings for fit-outs and alterations. Where they no longer match the building, as-built drawings are needed.

We keep a revision log through design and construction support, so the drawing set handed over at completion reflects what was actually approved and built.

What affects design time and cost

  • Height and gross floor area. More floors mean more coordination, longer calculations and more review departments.
  • Use mix. Retail, F&B or assembly uses in a residential building add fire and services requirements.
  • Basements. Excavation, shoring, dewatering and waterproofing add design and a site preparation stage.
  • Number of reviewers. Each service authority adds a review and possibly a design change.
  • Brief stability. Unit mix or use changes after developed design ripple through every discipline.

Authority fees for buildings depend on type and area and are revised from time to time. Every quotation lists them separately from our design fee.

Common building design problems at review

  • Core designed before the fire strategy. Stairs that don't meet travel distance or separation rules force a re-plan of every floor.
  • No space for utilities. Electrical rooms, substations and tank rooms added late eat into sellable area.
  • Parking that doesn't work. Ramp gradients, turning circles or numbers that fail the parking requirement.
  • GFA that doesn't reconcile. Area statements that differ from the plans or exceed the site plan allowance.
  • Façade chosen before performance. Full-height glazing that cannot meet the envelope requirements without major changes.

More examples are in our article on the role of engineering consultants in authority approvals.

How we help

  • Feasibility and massing before land or design commitments
  • Concept design and initial approval submissions
  • Coordinated architectural, structural, MEP and fire design
  • Service-authority coordination for Civil Defence, DEWA, RTA and others
  • Permit submission through a registered consultant, and comment responses
  • Construction-stage drawing support and inspection coordination

Building design FAQs

It is a Dubai Municipality service that reviews a project at concept stage, before detailed design. It is useful on larger buildings to confirm the planning basis early.

DM offers a separate site preparation permit for works such as hoarding, shoring and piling. Whether it suits your project depends on the plot and the programme, and it still needs approved drawings.

The stages are similar, but DM has a separate procedure for industrial buildings, and fire strategy, mezzanines and storage loads get particular attention. See our warehouse and industrial approvals page.

Yes. It applies across Dubai, including free zones. The free zone or special area authority runs its own approval process and may apply additional regulations.

The consultant named on the permit is responsible for the design it submitted, and its supervision duties during construction depend on the appointment and the authority's requirements. The contractor builds to the approved drawings, and any change on site needs a revised approval.

Have a plot and a brief?

Send the site plan, intended use and rough size. We will come back with what the plot allows and how we would stage the design.

Tell us about your project

Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.

  • A practical answer on which authority and NOCs apply
  • A clear list of the documents and drawings to prepare
  • A written scope and quotation for our consultancy work