Dubai Development Authority approvals
DDA approval is the permit from the Dubai Development Authority for fit-out, modification and building work in its zones, including Dubai Internet City, Dubai Media City, Dubai Knowledge Park and Dubai Design District. Most tenant projects need a DDA fit-out permit, applied for by the contractor with the landlord NOC and stamped drawings, followed by a fit-out completion certificate. Adding structure, changing use or adding floor area needs a building modification permit instead.
We confirm which DDA service fits your work, prepare the architectural, MEP and fire drawings, organise the landlord and authority NOCs, and follow the application through to completion. DDA makes the decision. Our job is to make sure the submission is complete and correctly classified, so it doesn't come back or need refiling.
The Dubai Development Authority (DDA) regulates planning and building work in its zones. "DDA approval" isn't one certificate. Depending on the work, it can mean:
People often call this "TECOM approval". TECOM Group runs many of the business districts, but DDA issues the permit. Landlord or building management consent is a separate step.
DDA's zones include Dubai Internet City, Dubai Media City, Dubai Knowledge Park, Dubai Design District (d3), Dubai Studio City, Dubai Production City, Dubai Outsource City and Dubai Science Park. Dubai Industrial City also falls under DDA.
The building decides, not just the district name, so we confirm it from your lease or plot documents first. Most mainland plots go to Dubai Municipality instead.
| Planned work | What it usually needs |
|---|---|
| Office, retail or restaurant fit-out in a unit | Landlord NOC and DDA fit-out permit |
| Added structure, a change of use or extra floor area | Building modification permit, not a fit-out permit |
| New building on a plot | Design approval and final building permit |
| Fire alarm, sprinkler or escape route changes | Civil Defence approval alongside the DDA permit |
| New electrical load or water connection | DEWA coordination |
Getting the classification right matters. If DDA finds that a fit-out application should have been a building modification, the fit-out fee isn't refunded. We check this before anything is filed.
The contractor applies for the fit-out permit through DDA's Zoning e-Services portal, not the tenant. The application needs:
The permit is valid for 6 months, so plan the works to fit or allow for an extension. For the tenant's view of the whole process, read our DDA fit-out permit guide and documents checklist. See also fit-out permits across Dubai.
For a completed building with a completion certificate. Structural work, a change of use or extra floor area goes this way, with an appointment signed by the owner, consultant and contractor. See change of use approvals and structural evaluation.
For new construction, once the design is approved. Owner, consultant and contractor roles need agreeing early, along with the permit, construction, inspection and completion stages. See our building design service.
Partitions, ceilings and lighting must match the air conditioning, electrical and fire systems. Check which systems the landlord provides. See office fit-out approval.
Layout, storage, shopfront, signage and display power are reviewed together, so settle them before ordering fixtures. See shop and showroom approvals.
Start with the cooking methods and equipment list. Extraction, drainage, food-safety and fire requirements follow from them. See restaurant and café approvals.
Production studios and technical rooms add equipment loads, cooling and access needs, so describe them in the brief, not just the partitions.
Most comments come from drawings that disagree with each other, or with the stamped baseline. We prepare one coordinated set; see engineering drawings for approval and interior design and space planning.
01
Check the building, unit and existing approvals, and define the full scope of work.
02
Fit-out, building modification or new building, based on structure, use and floor area.
03
One coordinated drawing set, plus the building owner and authority NOCs.
04
Filed by the appointed contractor or consultant, with the reference kept for tracking.
05
Each comment gets revised drawings, checked across the other disciplines before resubmission.
06
Build to the approved drawings, get the Civil Defence completion certificate, then the DDA completion certificate.
The fit-out completion certificate checks the finished work against the approved drawings. It needs the tenant's NOC, the tenant's licence for the unit and a Dubai Civil Defence completion certificate, so apply for the Civil Defence inspection in good time; leaving it late can hold up your handover.
Depending on the work, you may also need Civil Defence approval, DEWA approval and landlord or building management clearances. Our NOC coordination service tracks them together. See also building completion certificates.
Most DDA approvals typically take an estimated 7 to 15 working days once a complete application is submitted. A straightforward fit-out permit can be quicker, at 2 to 4 working days. Drawings, NOCs, comments and the works themselves come on top. Authority fees for most DDA approvals are an estimated AED 1,020 to 3,000, varying with the area and scope:
| DDA service | Estimated authority fee |
|---|---|
| Fit-out permit | AED 200 to 10,000 (AED 0.90 per sq ft) |
| Final building permit | From AED 200, at AED 1.00 per sq ft of built-up area; up to AED 250,000 for industrial plots |
| Building modification permit | AED 1.00 per sq ft of the added or affected built-up area |
| Fit-out completion certificate | Usually no service fee |
| Building completion certificate | AED 7,500 for the pre-inspection; AED 10,000 from the fourth request |
An AED 10 Knowledge Dirham and an AED 10 Innovation Dirham are added to each transaction. Other authorities' fees and our fee for drawings, submission and follow-up are separate, and we quote them separately, in writing.
| Authority | Typical areas |
|---|---|
| Dubai Development Authority | Dubai Internet City, Dubai Media City, d3, Dubai Science Park and other DDA zones |
| Dubai Municipality | Most mainland plots, including many villa communities |
| Trakhees (PCFC) | Nakheel communities, JAFZA and Dubai Maritime City |
See Dubai Municipality approval, Trakhees approval and how drawing approval differs by authority. JLT units follow a different route through Concordia.
You get a written scope before work starts, listing the approvals, drawings, responsibilities and exclusions.
It's the permit from the Dubai Development Authority for fit-out, modification and building work in its zones, followed by a completion certificate.
People use the names interchangeably, but DDA issues the permit. TECOM Group runs many of the business districts, and landlord consent is a separate step.
The contractor, through DDA's Zoning e-Services portal, with the tenant's appointment letter, Ejari, the building owner NOC, authority NOCs and stamped drawings.
When the work adds structural elements, changes the building's use or adds gross floor area. Fit-out fees aren't refunded if DDA reclassifies the project.
For completion, yes: the DDA fit-out completion certificate needs a Dubai Civil Defence completion certificate.
Most DDA approvals take an estimated 7 to 15 working days from a complete application, and a straightforward fit-out permit can take 2 to 4.
An estimated AED 0.90 per sq ft, with a minimum of AED 200 and a maximum of AED 10,000, plus AED 20 in added fees per transaction.
No. DDA makes its own decisions. We prepare a complete, correctly classified submission and answer comments quickly, which avoids most unnecessary delays.
Authority guides
The DDA fit-out permit explained for tenants in Dubai Internet City, Media City and other DDA zones: landlord NOC, submission, review, works and completion.
Read the guide
Fees, timelines and documents
The documents required for a DDA fit-out permit in TECOM business districts: tenancy, contractor, landlord NOC and drawings, and how to keep them consistent.
Read the guide
Fees, timelines and documents
How drawing approval works in Dubai across Dubai Municipality, DDA, Trakhees and Civil Defence: who reviews what, the steps and how to prepare a package.
Read the guide
Tell us the building and unit, what you plan to change and which drawings or approvals you already have. If DDA has already issued comments, send the reference and what is outstanding. We'll tell you which approvals apply, in what order, and what we need to start. The form sends your enquiry to us by email; you can share drawings once we reply. Please don't include identity documents in the first enquiry.