Permits & NOCs · Salons, spas and fitness
For owners and operators opening a hair salon, beauty centre, spa, massage centre or gym. We design a layout that meets the hygiene rules, coordinate the fit-out and fire approvals, and prepare the furniture layout the health and safety review needs.
Salons, spas and gyms sit in an unusual place in Dubai's approvals. They are ordinary commercial fit-outs, but Dubai Municipality's public health rules also reach right down to the furniture: how far apart the chairs are, how big a treatment room is, and where every wash basin goes.
That means the layout drawing does two jobs. It has to pass the building and fire review like any other fit-out, and it has to satisfy a health and safety review that checks the plan against specific dimensional rules. Get the layout right once and both reviews go smoothly. Design it purely for looks and you may lose a treatment room or a styling station at the last moment.
The general fit-out route is on our fit-out permits page. This page covers what is specific to beauty, wellness and fitness premises. We are a private consultancy: Dubai Municipality, Civil Defence and the other authorities issue the approvals.
The unit's decoration or fit-out permit from the authority for the location, plus the landlord's or developer's approval. Dubai Municipality's health guidance says the business must get construction or architectural approval from the building licensing authority.
Civil Defence approval of the layout and fire systems. Gyms, saunas and spaces with many people or wet equipment get particular attention.
Dubai Municipality's No Objection Permit for Practicing Health and Safety Activities, which comes with an approved furniture layout.
Alongside these sit the trade licence for the correct activity and, for some activities, approvals from other bodies. Medical or clinical treatments are outside the beauty licence altogether (see below).
Dubai Municipality's Health and Safety Department issues a no-objection permit for a defined list of activities. Its technical requirements document (version 3.0, May 2024) covers:
According to that document, the permit is needed for a new company or branch, a change to the furniture layout, adding an activity to the licence, moving location, or a mobile activity. It is applied for through the company's account on the Dubai Municipality website. The main document is a single-page furniture layout showing every service, the furniture, dimensions in metres and areas in square metres; a two-floor shop shows both floors on that one page.
DM's service card lists the service as free, with a completion time of one working day. That is the review time for a complete application. It does not include design, landlord approval or the fit-out itself.
Hotel spas and salons: the document excludes shops licensed only under a hotel establishment's licence. If the salon or spa has its own separate licence, the requirements apply to it.
The technical requirements set specific dimensions that the furniture layout is checked against. For salons and beauty centres they include:
| Element | Requirement in DM's technical requirements |
|---|---|
| Hair cutting and styling chairs | 1 m between chairs, and at least 0.5 m between the last chair and the wall |
| Manicure and pedicure stations | Separated from other services, 0.5 m between chairs and at least 0.5 m to the wall, with a hand wash basin and foot wash basin |
| Facial and waxing rooms | At least 6 m², fixed walls (no curtains, folding or temporary partitions), a dedicated hand wash basin in the room |
| Basins in the common area | A hair-washing basin and a separate hand wash basin, with waterproof finish at least 0.5 m around |
| Corridors | At least 1.2 m wide |
The same document lists which services each licence type may offer. A salon may offer hairdressing, manicure and pedicure, facials and waxing. A beauty centre covers the beauty services but not hairdressing. Jacuzzi, sauna and steam belong to spa clubs, Moroccan baths to oriental baths, and massage to massage and relaxation centres. Draw a service on the layout that your licence does not cover, and the layout is likely to be returned. Our article on salon and spa approvals walks through the licence side in more detail.
Mixed-gender premises: where a licence covers services for both men and women, DM requires the two sections to be completely separate, each with its own external entrance and no shared areas. This has a large effect on the floor plan and should be settled before you sign a lease.
Spa and massage layouts follow their own set of rules in the same document:
Wet areas such as Moroccan baths, steam rooms, saunas, jacuzzis and plunge pools are where the design effort goes. Dubai Municipality's compliance guideline for spa and massage centres checks items such as non-slip, impermeable floors, approved wall and ceiling materials, proper drainage, ventilation and air-conditioning, shower and changing facilities, and hot water and showerhead hygiene. For the building approval, these spaces bring:
Pools in spas also follow DM's swimming-pool rules; DM's spa checklist includes whether pool construction and design were permitted by Dubai Municipality. Our MEP design service covers the ventilation, drainage and electrical side.
A gym looks like open space, but for fire safety it is a busy assembly-type room full of equipment, often with classes that pack many people into a studio at once. Reviewers focus on:
Our article on gym fire-safety approval goes into the Civil Defence side in more depth.
Dubai Municipality's guidance says the furniture layout must not include medical, treatment or specialised services outside the Health and Safety Department's scope, and that approvals for those must come from the competent authorities. Treatments that count as healthcare, such as many aesthetic and cosmetic medical procedures, are licensed by the health authority, not under a salon or beauty licence. If your concept mixes beauty and medical services, plan it as a health facility for those parts; see our clinic and pharmacy fit-out page.
Confirm the authority, landlord rules, drainage and extract options, and whether a gender-separated layout with two entrances is possible.
You + our team
Plan stations, rooms, basins and corridors to the DM dimensions, and to the services your licence will cover.
Designer · consultant
Submit the fit-out drawings to the landlord and the building authority, through a registered consultant or approved contractor where required.
Consultant · contractor
Fire alarm, sprinklers, emergency lighting, exits and occupant load approved for the layout.
Consultant · fire contractor
Upload the single-page furniture layout through the company's DM account and respond to any comments.
Business owner · our team
Build to the approved drawings, pass inspections and keep the approved layout on site. Changing the layout later means applying again.
Contractor · authorities
Dubai Municipality's technical requirements set at least 6 m² for facial and waxing rooms and for spa and massage service rooms, with fixed walls and a hand wash basin in each room.
Only with complete separation. DM requires separate sections for men and women, each with its own external entrance and no common areas.
DM's service card lists one working day, free of charge, for a complete application. Design, landlord, fit-out and Civil Defence approvals come before it and take longer.
Yes. A modification to the furniture layout is listed as one of the cases that need a new no-objection application.
Yes. Gyms and studios can hold many people at once, so occupant load, exit capacity and keeping equipment out of escape routes are central to the Civil Defence review.
On this page
Opening a salon, spa or gym?
Send the unit plan and the services you want to offer. We will check the layout against the rules before you commit to a design.
Service
Fit-out approval for commercial and residential units in Dubai: landlord NOC, DM, DDA or Trakhees permit, Civil Defence, documents, process and completion.
Read more
Service
DCD approval support in Dubai for fire and life-safety drawings, fire alarm and firefighting coordination, submissions, inspections and completion.
Read more
Service
Get support for Dubai Municipality approval: drawings, NOCs, permits, submissions and completion coordination. Check the approval route for your project.
Read more
Service
Fitting out a clinic, dental practice or pharmacy in Dubai? How the DHA layout, building permit, Civil Defence and inspection stages fit into one programme.
Read more
Service
Create interiors that support daily use while respecting the property’s technical limits. We connect the design brief, layout development, material decisions and approval-related coordination.
Read more
Guide
A salon or spa’s room schedule should reflect the services actually offered.
Read more
Guide
A gym’s safety assessment needs the real layout and intended occupancy.
Read more
Guide
A practical fit-out register lists each permission, issuer, scope, owner and status.
Read more
Guide
Inspection preparation should compare the completed work with the approved package and required evidence.
Read more
Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.