Answers to common questions about Dubai approvals: where to start, which authority applies, timeframes, drawings and how we work.
Identify your property and proposed work. A short brief and existing records help determine which approval, design or execution service is relevant.
No. The location, property records, proposed activity and specific work determine the applicable authorities and management bodies.
Not necessarily. Each permission has its own scope and issuer. Confirm the full route for your project.
Yes. Include the lease information and explain whether owner consent is available. The authorised applicant and required approvals must be confirmed.
Share the actual comments, latest drawings and submission history. This allows the remaining work to be assessed against the current record.
This website does not upload files. Send an enquiry or message us on WhatsApp, and share relevant drawings in the conversation when appropriate.
The quote depends on scope, available information, technical inputs and agreed responsibilities. Authority charges and third-party work should be distinguished.
The relevant issuing body. Consultancy or contracting support does not guarantee an authority decision.
It depends on the authority and how complete the submission is. As estimated ranges, Dubai Municipality reviews usually take 3 to 7 working days, DDA 7 to 15 working days and Civil Defence 15 to 20 working days once a complete submission is accepted. Preparing drawings, collecting NOCs and answering comments add to this. See how we work for typical periods by authority.
Usually, yes, in master communities. The developer's NOC confirms the work meets the community rules, and the authority's permit confirms it meets the building codes. One does not replace the other, and the NOC normally comes first. Our NOC coordination service handles both in sequence.
Yes. Our approval and drawing services work independently of who builds. We prepare the drawings and permits, and coordinate with your contractor on site so the works match the approved set. If you prefer one team from permit to handover, see our execution services.
Yes. We can survey the property and prepare as-built drawings, or convert scanned drawings into editable files through PDF to CAD conversion. These become the base for the renovation, extension or completion application.
Yes. Drawings are delivered as PDF sets for submission and as AutoCAD DWG files, so your team or contractor can keep working on them. Our CAD drafting services cover architectural, structural and MEP drawings.
The property location, the type of property, a short description of the work and any documents you have: title deed or lease, affection plan, approved drawings and the developer's or landlord's guidelines. Photos of the existing space help. Use the project enquiry form or WhatsApp.
Yes. Most commercial fit-outs need Civil Defence approval of the fire and life safety design and an inspection before completion. We prepare the drawings, coordinate with the fire contractor and prepare for the inspection. See Civil Defence approval.
All of Dubai, including mainland areas under Dubai Municipality, DDA zones, Trakhees and JAFZA areas, Dubai South, free zones and master communities such as those by Emaar and Nakheel. Approvals by community explains who approves what in 24 areas.
Yes. Share the authority's comments, the drawings that were submitted and the submission history. We review what was raised, revise the drawings or documents and prepare a response. Our guides to rejections and common mistakes explain the usual causes.
Most permits close with inspections and a completion certificate. We prepare the inspection requests, test certificates and as-built records the authority needs. See building completion certificates.