Communities · Mainland Dubai industrial area
In Al Quoz a warehouse might become a gallery, a gym, a showroom or a production studio, or simply a better warehouse. We prepare the drawings and coordinate the Dubai Municipality and Civil Defence approvals that each of those changes needs.
Al Quoz is where Dubai's warehouses get reinvented. Alongside the factories and storage sheds of Al Quoz Industrial 1 to 4, old units now house galleries, design studios, climbing walls, specialist gyms and car showrooms. Each conversion asks the same question of the authorities: is this building safe for the people who will now be inside it?
| Area type | Mainland Dubai. The industrial zones in the south of Al Quoz sit beside a mixed creative and commercial district. |
|---|---|
| Building-permit authority | Dubai Municipality, the authority for mainland plots outside free zones. DM publishes topographic maps for the Al Quoz industrial area. We confirm each plot's authority and permitted use from its site plan. |
| Fire and life safety | Dubai Civil Defence |
| Business mix | Dubai Economy reported 12,437 operating companies in Al Quoz in 2021, mostly commercial and professional licences, with Al Quoz Industrial 2 among the busiest sub-areas |
| Typical projects | Change of use, warehouse fit-outs, mezzanines, showroom frontages, workshop upgrades, regularising older alterations |
Creative zone: Dubai launched the Al Quoz Creative Zone in April 2021 to attract creative businesses. That is a licensing and economic initiative. Building works there still need the normal permits.
A warehouse is designed for goods and a handful of staff. A gym, event space or gallery may hold dozens or hundreds of people. That shift is what reviewers focus on, more than the finishes.
The full route is on our change of use approval page, with background in our article on change of use in Dubai. For fitness uses, see salon, spa and gym approvals. For car and furniture showrooms, see retail and showroom fit-outs.
Plenty of Al Quoz tenants keep the storage use and simply want more from the space. The common requests:
See our warehouse and industrial approvals service for the full process.
Read the site plan's permitted use and compare the shed with its approved drawings. Plan an as-built survey if they differ.
Tenant · landlord · consultant
Get written approval from the owner for the proposed works and use.
Tenant · landlord
Architectural, structural and MEP drawings, submitted to Dubai Municipality through a registered consultant, or as a decoration permit through an approved contractor where that fits.
Consultant · contractor
Fire and life safety drawings approved, systems installed by an approved fire contractor, then inspected.
Fire contractor · DCD
Completion paperwork supports the trade licence for the new activity.
Authorities · tenant
We don't quote fixed authority fees for these projects, because they depend on the service, the area and the scope. The factors that move the budget most in Al Quoz are practical ones:
Our article on warehouse fit-out costs and hidden costs covers the items tenants most often miss.
Ras Al Khor Industrial has similar older stock and its own pitfalls; see approvals in Ras Al Khor Industrial.
Before ordering steel, check which permits, drawings and NOCs your unit needs in our guide to getting a warehouse mezzanine approved in Dubai.
Sometimes. It depends on the plot's permitted use and whether the building can meet the fire and exit requirements for many more occupants. Check this before signing the lease.
Dubai Municipality issues the building and decoration permits, and Dubai Civil Defence approves fire and life safety. We confirm the authority for each plot first.
We are not aware of a separate building-permit authority for it. It was launched as a business and licensing initiative, and building works follow the mainland permit route. We confirm per plot.
Only safely and legally if it was approved. Ask the landlord for the permit drawings. If there are none, plan for a structural check and regularisation.
On this page
Found a unit in Al Quoz?
Tell us the plot, the current use and what you want to open. We will check feasibility before you sign.
Service
Turning a villa into a nursery, a shop into a clinic or a warehouse into a showroom? How change of use approval works in Dubai: authorities, drawings and steps.
Read more
Service
Get support for Dubai Municipality approval: drawings, NOCs, permits, submissions and completion coordination. Check the approval route for your project.
Read more
Service
DCD approval support in Dubai for fire and life-safety drawings, fire alarm and firefighting coordination, submissions, inspections and completion.
Read more
Service
Approvals for warehouse mezzanines, high-bay racking, new storage uses and industrial unit changes in Dubai: Civil Defence, structural checks, Trakhees and DM.
Read more
Service
Opening a salon, spa, massage centre or gym in Dubai? Health and safety layout approval, wet areas, room sizes, gym occupancy and fire safety, explained.
Read more
Guide
A proposed change of use can affect much more than partitions.
Read more
Guide
A mezzanine can change the way occupants reach safety and how systems serve a warehouse.
Read more
Guide
A gym’s safety assessment needs the real layout and intended occupancy.
Read more
Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.