Swimming pool
As-built swimming pool and pump room site plan
Site plan locating the as-built swimming pool and underground pump room within a residential plot, with setbacks and ground levels.
AutoCAD drafting · DWG · Dubai
Most drafting jobs start with something that already exists: a hand sketch, a marked-up PDF, an engineer's calculations, a set of old drawings or a few photos and tape measurements. What you need is a clean, accurate drawing set that the rest of the project can rely on. That is what our CAD drafting service produces.
We draft architectural, structural and MEP drawings in AutoCAD for architects, interior designers, contractors, consultants, fit-out companies and property owners in Dubai. You receive editable DWG files and a PDF set, drawn to scale, layered properly and checked before they leave us. If the drawings then need engineering design, an approval package or a submission to an authority, the same team can carry them through. You decide where the scope starts and stops.
Each service below has its own page with the detail of what is included. Use this list to find the one closest to what you need.
Floor plans, elevations, sections, site plans, roof plans, reflected ceiling plans and door and window schedules, drawn from your sketches, mark-ups or existing drawings. Suited to villa extensions and renovations, apartment layout changes, retail and office fit-outs and commercial buildings. See architectural CAD drafting.
Foundation and piling layouts, column, beam and slab drawings, reinforcement details, bar bending schedules and steel connection details. Our engineers can carry out the structural design and check the drawings, or we draft to your own engineer's design. See structural drawings and reinforcement detailing.
HVAC and ventilation layouts, lighting and power drawings, single-line diagrams, water supply and drainage layouts, fire fighting and fire alarm drawings, and coordinated services plans and sections. See MEP drawing preparation.
Contractor-side drawings that show how joinery, steelwork, MEP installations and fit-out items will actually be built, prepared for the consultant's review and revised against their comments. See shop drawing preparation.
Drawings that record what was built, either from a measured site survey or from the contractor's marked-up drawings at handover. Often needed for a completion certificate, a resale or a new permit on an older property. See as-built documentation.
PDFs, scanned sheets and paper prints redrawn as editable DWG files, with the scale checked against printed dimensions rather than traced blindly. See PDF to editable DWG conversion.
2D sheet sets for permits and site work, and AutoCAD 3D models where a project benefits from them, such as complex geometry or coordination in tight ceiling voids. See 2D and 3D CAD drafting.
Extra drafting capacity for firms that need help through a busy period, a tender deadline or a backlog of drawings, working to your own templates and standards. See outsourced CAD drafting.
These three services are often confused, and choosing the right one at the start saves money and time.
| What you need | What it involves | Where it fits |
|---|---|---|
| Drafting | You already have the design, sketch or engineering input. We turn it into accurate, coordinated CAD drawings. | This page and the drafting services above |
| Design | The design itself still needs to be developed: layouts, structure, building services, compliance with the Dubai Building Code. | Villa design, building design, MEP design |
| Approval package | Drawings prepared to an authority's requirements and submitted for a permit or NOC. | Engineering drawings for authority approval |
A drafted set is not automatically an approval set. Dubai Municipality, the Dubai Development Authority, Trakhees, Dubai Civil Defence and DEWA each expect particular sheets, notes, stamps and formats, and the route depends on where your plot is. If your drawings are heading for a permit or a developer NOC, tell us when you ask for a quote. We can draft with the submission in mind from the first sheet, rather than redrawing later.
You don't need a perfect brief to get started. Send whatever you have, and we will tell you what is missing before we price the work. The most useful inputs are:
The enquiry form takes a short description of the job. Once we reply, you can send the files by email or WhatsApp, or share a download link for large sets.
Every job is delivered as editable AutoCAD DWG files, with a PDF set for printing and review. DXF files are available if your software or a fabricator needs them. Files are purged and audited before issue, so they open cleanly and don't carry unused layers, blocks or broken references.
Unless you give us your own standard, drawings follow consistent conventions throughout the set:
Many of our clients are architects, consultants and contractors with their own standards. We work in your template, use your layer names and title block, and follow your sheet numbering, so the drawings slot straight into your project files without rework.
01
We look at what you have sent and list anything unclear or missing.
02
We confirm the sheet list, the level of detail, the format, the revision allowance and the delivery date in writing.
03
The drawings are produced, and queries are raised on a list as they come up rather than guessed on the sheet.
04
A second person checks the drawings against the source information before issue.
05
You receive the DWG and PDF set for review.
06
Your comments are incorporated, each change is clouded and recorded in the revision table, and the set is reissued.
07
You receive the final DWG and PDF set and the drawing register.
Accuracy is the reason to pay for drafting, so every set is checked before it reaches you. The checks cover:
Anything we cannot confirm from the information provided is marked on the drawing or listed in the query sheet, so you know exactly what was assumed.
CAD drafting is priced on the scope, not by the hour you can't see. The main factors are:
You receive a written quotation with the scope, the number of revision rounds included and the delivery date before any work starts.
A selection of CAD drawings from projects with authority documentation: villa plans, pool drawings, fit-out layouts and structural sections.
For a plain comparison of two common drawing sets, read our guide to shop and as-built drawings.
Preparing a set for upload? Our guide to CAD drawing requirements for Dubai authorities covers formats, sheet sizes and title blocks.
Swimming pool
Site plan locating the as-built swimming pool and underground pump room within a residential plot, with setbacks and ground levels.
Structural
Pump room layout with the pump and pipework arrangement, and sections showing reinforcement, blockwork, plaster and waterproofing.
Fit-out · Architectural
Proposed ground-floor partition layout with consultation rooms, reception, waiting area, pantry and staff room.
Villa modification · Architectural
Proposed ground-floor layout for the modified villa, with the changed areas clouded for review.
Swimming pool
Pool plan with floor levels, main drains, inlets, skimmers and vacuum points, and notes on lighting and electrical protection.
Fit-out · Architectural
Proposed mezzanine layout with surgery, X-ray, laboratory, pharmacy, preparation and animal care rooms.
Need CAD drawings for a submission?
Share your sketches, PDFs or existing drawings with our team to discuss the CAD set your project needs.
A short description of the job, the sheets you need and your deadline. After we reply, send any sketches, PDFs, existing drawings, photos or engineering input you have. We will tell you what else, if anything, is needed before we confirm the price.
Yes. Sketches and redlined PDFs are among the most common starting points. Clear dimensions make the job faster; where a dimension is missing, we raise it as a query rather than guess.
Editable AutoCAD DWG files and a PDF set as standard, with DXF available on request. Tell us your AutoCAD version if you need files saved to an older format.
Yes. Send your template, layer standard and title block with the first job, and we will draft to them throughout.
The number of revision rounds is set out in your written quotation, based on the size of the job. Further changes outside that allowance are quoted before they are made.
It depends on the number of sheets, the quality of the source information and the level of detail. We confirm the delivery date in the written scope before starting, and agree an earlier date where the job allows it.
Our engineers can design and check the structural and MEP work for you. If you already have an engineer, we draft to their design and they remain responsible for it. The scope states which route applies.
No. Drafting produces the drawings. An approval package is prepared to a specific authority's requirements and submitted for a permit or NOC. We can do both; see engineering drawings for authority approval.
Yes. If the changes are known and documented, we update the drawings directly. If not, a measured survey and as-built drawings give a reliable starting point.
Yes. Many projects start with drafting and continue into design, the approval package and submission with the same team, so the drawings stay consistent from the first sheet to the permit.
On this page
Send a short description, the sheets you need and your deadline.
Service detail
Full drawing packages prepared and submitted for Dubai authority approval.
View details
Service detail
Measured surveys and drawings of what is actually built.
View details
Service detail
MEP engineering design with DEWA and Civil Defence approval.
View details
LET’S TALK ABOUT YOUR PROJECT
Tell us what you need drawn, the format and your deadline, and we will confirm the scope and price.
Tell us what you are planning
Tell us what you need drawn: the type of drawings, the number of sheets, the format and your deadline. Once we reply, send your sketches, PDFs or existing drawings by email or WhatsApp, and we will confirm the scope and price in writing.
Use the form below, or message us on WhatsApp for the quickest reply.