Drafting support for firms in Dubai
Drafting workload rarely arrives evenly. A tender lands with a two-week deadline, three projects reach construction drawings at once, a client asks for as-builts on a building you finished last year, or your only drafter is on leave. Hiring for a peak takes time and leaves you with spare capacity once it passes. Pushing the work through an overloaded team usually shows in the drawings.
We provide outsourced CAD drafting in AutoCAD for architects, engineering consultants, MEP and fit-out contractors and developers in Dubai. You send the work, we draft it to your standards and deadlines, and the drawings come back ready to go into your project files under your title block. Because our team also handles design, engineering and authority approvals, we understand what the drawings are for, not just how to draw them.
Outsourcing works best when the design decisions stay with you and the drawing production can be handed over. Typical situations include:
It is less suitable where the brief is still changing daily or the drafter needs to sit in design meetings every morning. In those cases, we suggest a defined scope with agreed review points instead.
You send a defined package, such as a set of floor plans, an MEP layout package or a run of shop drawings, with a sheet list and a deadline. We quote for the package, draft it, check it and deliver it. This is the easiest way to start.
For a period of weeks, we take on drafting across one or more of your projects as work comes in. We agree a point of contact on each side, the type of work, how requests are sent and the expected response time for each kind of task.
For firms with a steady flow of drafting, we act as an extension of your team over a longer period. Standards, templates and communication routines are set up once, so each new request starts quickly. Terms such as rates, volumes and turnaround are agreed in writing.
In every case, the written scope states what is included, the delivery dates, the number of revision rounds and how additional work is priced.
01
You tell us the type of work, the volume and the deadline. We confirm whether it suits outsourcing and what we need.
02
You send your templates and standards, plus one typical drawing as a reference for presentation.
03
We agree a small, clearly defined package with a sheet list and a delivery date.
04
The package is drafted to your standard and checked before return.
05
Your team reviews it closely and marks anything that doesn't match your expectations or standard.
06
We correct the package and record your comments in a standards note for future jobs.
07
Later work starts from the agreed standard, so the review on your side becomes lighter with each job.
Outsourcing the drafting doesn't mean handing over the project. Your team keeps:
Drawings that need reworking to match your office standard aren't saving you any time. Before the first job, we ask for:
The first job is used to align with your standard. You review it closely, we record any corrections, and the same standard is then applied to every job after it. If you don't have a formal standard, we work to a consistent one of our own and document it so your team can follow it too.
One point of contact. You deal with the same person for each project, who knows the job and the history of its revisions.
Query lists, not guesses. When information is missing or two drawings disagree, we send a short query list rather than inventing an answer. Questions are batched so they don't interrupt your team constantly.
Progress you can see. On larger packages, we send a short update at agreed points: what has been drafted, what is waiting on information and whether the delivery date is still on track. If a query is holding up a sheet, you hear about it while there is still time to answer, not on the delivery day.
File exchange. Files are exchanged by email, WhatsApp for quick items, or a shared folder or download link for larger sets. We follow your version control, so the latest issue is always clear.
Confidentiality. Project drawings and client information are used only for your job and are not shared with others. Tell us at the start if your firm has specific requirements for how drawings are stored or exchanged.
Outsourced work can include any of our drafting services:
Where a job needs engineering input, our engineers can provide the design, or we draft to your engineer's design. And where drawings are heading for a permit or NOC, our team can prepare and submit the approval package if you want to hand that over too.
We quote per package for single projects and agree rates in writing for ongoing support, so you know the cost of each piece of work before it starts.
If your drafter is new to Dubai submissions, share our notes on how to set up drawings for each authority.
Yes. Send your templates, title blocks and layer standard before the first job, and we will draft to them throughout.
Project drawings and client information are used only for your work and are not shared. If your firm has requirements for file storage or exchange, tell us before sending drawings.
By email, WhatsApp for small items, or a shared folder or download link for larger sets, following your version control.
One named person for each project, who handles queries, issues and revisions.
Often, yes, depending on the volume and the current workload. Tell us the deadline when you first contact us, and we will confirm what can be delivered by when before you commit.
Our drafting service is based in Dubai and set up for Dubai projects and firms.
Every set is checked before return, your corrections are logged and applied to later jobs, and the same standard is used throughout.
Yes. A small first package is a good way to align with your standards before larger work.
Revision rounds are agreed in the scope. Each revision is clouded, recorded in the revision table and reissued as a complete set.
Architectural, structural and MEP drafting, shop drawings, as-built drawings, PDF to CAD conversion, and 2D drawings and 3D models.
On this page
Service detail
All our drafting services in one place.
View details
Service detail
Shop drawings for joinery, steel, fit-out and MEP packages.
View details
Service detail
Approval packages prepared and submitted for you.
View details
LET’S TALK ABOUT YOUR PROJECT
Start with one package and we will align with your standards before taking on more.
Tell us what you are planning
Tell us about your firm, the type of drafting you need and the volume or deadline. We will suggest a first package so you can check our work against your standards.
Use the form below, or message us on WhatsApp for the quickest reply.