Authority guides
Trakhees regulates building works in Jebel Ali, Dubai Maritime City and several Nakheel communities. Here is how its permit process works.
Trakhees is the regulatory arm of the Ports, Customs and Free Zone Corporation (PCFC). It regulates building and modification works across its jurisdiction, which includes the Jebel Ali Free Zone, Dubai Maritime City and several communities developed by Nakheel. If your villa, warehouse, office or facility falls under Trakhees, its process, portal and requirements apply, not Dubai Municipality's.
This guide explains which areas Trakhees covers, how its engineering and safety reviews work, the steps in the permit process, typical fees and review times, and how developer NOCs fit in. For project support, see our Trakhees approval service, and if an application has been returned, our guide to why Trakhees approvals get rejected.
Trakhees' jurisdiction includes:
The exact jurisdiction should be confirmed for each property, since neighbouring areas can fall under different authorities.
Trakhees reviews projects through different departments, commonly referred to as:
| Department | What it covers |
|---|---|
| Civil Engineering Department (CED) | Building permits, structural and architectural review, modifications, completion |
| Environment, Health and Safety (EHS) | Environmental, health and safety aspects, including fire safety and hazardous materials |
Depending on the project, one or both may be involved. A warehouse storing hazardous materials, for example, will involve EHS more heavily than a villa renovation.
In 2027, Trakhees approval typically takes an estimated 8 to 20 days once a complete application is submitted, depending on the permit type and the scope of work. Authority fees for most Trakhees approvals are an estimated AED 1,500 to 4,000, varying with the project specification, permit type and area; modification works on an existing property are an estimated AED 1,000. Developer fees, consultancy and other authorities' charges are separate.
| Area | Typical prerequisite |
|---|---|
| Nakheel communities | Nakheel modification NOC; see the Nakheel application process |
| JAFZA | JAFZA modification NOC; see JAFZA warehouse modifications |
| Dubai Maritime City | Master developer or landlord consent as applicable |
Trakhees may require a valid master developer NOC to revalidate a lapsed modification permit, so keeping both valid matters when projects are delayed.
After works, Trakhees issues the relevant completion certificate. For modifications after an existing completion, a modification completion certificate closes the change. Under Trakhees circulars, extensions and minor structural modifications to existing facilities may need a modification NOC regardless of area, followed by a modification completion certificate.
For villas in Nakheel communities, the Trakhees process focuses mainly on CED review of the modification, with the Nakheel NOC as the key prerequisite. For industrial projects in JAFZA, EHS considerations, such as stored materials, ventilation and fire safety, can be as significant as the engineering review, and the facility's activity must be permitted for the building type. The same authority, but very different submissions.
It depends on the location. Confirm jurisdiction for your specific property before preparing drawings.
CED covers engineering and building permits; EHS covers environmental, health and safety aspects.
In Nakheel communities under Trakhees, the Nakheel NOC usually comes first.
Registered consultants or contractors, depending on the service.
Authority fees for most approvals are an estimated AED 1,500 to 4,000, depending on the project, and modification works an estimated AED 1,000.
Yes. Applications submitted through the Trakhees portal can be tracked by the applicant, and comments are issued through the system.
Send us the property location and the works you plan. We will confirm jurisdiction, coordinate the developer NOC, prepare the submission and manage the Trakhees process through to completion.
For projects in Dubai Maritime City, check how approvals are divided before you start; see our Dubai Maritime City guide.
RELATED SERVICE
Prepare modification or construction submissions for a property under Trakhees jurisdiction. We help connect the proposed work to the appropriate PCFC service and organise the information needed for review.
Rejections and common mistakes
Why Trakhees applications get rejected or delayed: wrong service, missing NOCs, inconsistent drawings, EHS gaps and contractor issues, and how to fix them.
View details
Authority guides
Start with the goods and how the warehouse will operate.
View details
Fees, timelines and documents
Coordinating the drawing package before submission.
View details
LET’S TALK ABOUT YOUR PROJECT
Tell us the location, property type and work you have in mind.