Authority guides
Before you change a villa, townhouse or unit in a Nakheel community, you need Nakheel's modification NOC, often an authority permit, and access permits for your contractor. Here is how the pieces fit together, from application to completion.
A Nakheel NOC is the no objection certificate that Nakheel's Urban Planning team issues before you alter a property in a Nakheel community. You request it online through Nakheel Online Services or the My Nakheel app, with drawings and documents, and Nakheel checks the design against its community guidelines. Works that touch structure, services or built-up area also need a permit from the authority for your plot, which in most Nakheel communities is Trakhees. Only then can your contractor apply for a work access permit to get on site.
This guide is written by the DXB Approval Team. We prepare drawings and documents for Nakheel modification applications, submit them for homeowners and contractors, and coordinate the Trakhees or Dubai Municipality permit that follows. Nakheel and the authority make every decision, so treat the figures here as planning estimates and follow the conditions written on your own NOC.

The Nakheel NOC, often called the modification NOC or Nakheel approval, is Nakheel's written consent to a specific change at a specific property. Nakheel's customer guidance is plain: get an NOC from its Urban Planning team before making any alterations. Owners and contractors often call this team the Nakheel planning department.
The review is about the community, not building safety. Urban Planning checks how the change looks from the street and from neighbours, setbacks, the original design character and the guidelines for your property type. It is not a building permit and does not replace the authority's structural and MEP checks.
Do not confuse it with the Nakheel resale NOC, a separate Owner Services request for selling or transferring a property, with its own fee and validity.
Most real projects need two approvals, in this order:
Which authority issues the permit depends on the plot. Trakhees, the regulator for Dubai's special development zones under the Ports, Customs and Free Zone Corporation, covers many Nakheel master communities, including Palm Jumeirah, Jumeirah Village Circle and International City. Nakheel's own contractor access rules ask for a valid Nakheel and Trakhees NOC for construction, modification and extension work, which shows how common that route is.
Not every plot follows it. Some plots inside Nakheel areas were sold to other developers, and some areas fall under Dubai Municipality. The authority for your area is usually Trakhees, sometimes Dubai Municipality, and we confirm it for each plot before drawings are finalised. Our guide to the Trakhees permit process explains the second stage in detail.
The rule of thumb: if the work changes the layout, structure, services or outside of the property, plan for a Nakheel NOC. Cosmetic internal work and like-for-like repairs usually do not need one, but the contractor still needs an access permit to enter the community.
| Work | Nakheel NOC | Authority permit (usually Trakhees) | Contractor access permit |
|---|---|---|---|
| Interior painting, repairs, AC servicing | Usually not | No | Daily or long-term permit |
| Kitchen or bathroom refit, same layout | Check with Nakheel | Usually not, unless services move | Long-term permit |
| Moving or removing internal walls | Yes | Yes if structural | Long-term permit |
| External colour, windows or doors | Yes | Usually not | Long-term permit |
| Pergola or shade structure | Yes | Often, for fixed structures | Long-term permit |
| Boundary wall, gate or fence | Yes | Depends on height and build | Long-term permit |
| Swimming pool | Yes | Yes | Long-term permit |
| Extension or enclosed terrace | Yes, where allowed | Yes | Long-term permit |
| Solar panels or roof structures | Yes | Yes, plus the DEWA route for solar | Long-term permit |
Some items have their own guides. Shade structures are covered in our pergola approval guide, pools in our swimming pool regulations, and added space in our article on whether a villa extension is feasible.
Four different permissions get mixed up, and each has its own application.
| Nakheel NOC | Authority permit | Contractor access (work) permit | Move-in or move-out permit | |
|---|---|---|---|---|
| What it covers | The design of the change | Regulations, structure, safety | Workers and vehicles entering the community | Moving furniture in or out |
| Issued by | Nakheel Urban Planning | Trakhees or Dubai Municipality | Nakheel Security | Nakheel community team |
| Who applies | Owner or authorised consultant | Registered consultant | The contractor company | Owner or tenant |
| When | Before any design is final | After the NOC | After the NOC and permit | Around the moving day |
When people search for a Nakheel work permit, they usually mean the contractor access permit. Nakheel Security issues it through Nakheel Online Services under General Services, then Security Services. It is not a design approval, and for construction work Nakheel Security asks to see the approvals first.
The portal shows the exact list for your request, and it varies with the community and the scope. Prepare the following as a starting point.
For the Nakheel NOC
For the contractor's long-term access permit, Nakheel asks for construction, modification and extension work:
Nakheel Security may ask for more documents depending on the work.
The full route usually runs like this.
The Nakheel rows are Nakheel's own service charges. The Trakhees and Dubai Municipality rows are our planning estimates, and final amounts depend on the community, the property and the scope.
| Stage | Fee | Time |
|---|---|---|
| Nakheel villa alteration NOC, no swimming pool | AED 5,000 | About 4 working days once all documents are complete |
| Nakheel villa alteration NOC, including a swimming pool | AED 15,000 | About 4 working days once all documents are complete |
| Nakheel preliminary design review, for a new design | AED 10,000 for a villa, AED 25,000 for a building | 3 to 4 working days, once paid |
| Amending a Nakheel-approved design | AED 5,000 for a villa, AED 10,000 for a building | About 2 working days, once paid |
| Extensive works such as extensions, end to end | Depends on scope | Around 4 to 6 weeks |
| Trakhees permit, most approvals | AED 1,500 to 4,000 | 8 to 20 days |
| Trakhees, modification works | Around AED 1,000 | 8 to 20 days |
| Dubai Municipality, where it applies | AED 300 to 1,500 | 3 to 7 working days |
| Nakheel long-term access permit | Depends on workforce size | Typically 1 to 2 days to approve |
Extensions and larger alterations take longer because they attract more comments and need full structural and MEP review. Get a specific project costed before you commit to a design, especially where new built-up area is involved.
Nakheel offers two kinds of access permit through its online services.
For work in Nakheel common areas, outside the plot, contractors also need a Nakheel agreement or DMS copy, and must pay the required security deposit, submit a site access permit and install the site fence before starting. Plan this early, as it can delay the start even with the NOC approved.
The owner, or a consultant or contractor with the owner's written authority, applies for the Nakheel modification NOC. A tenant who wants changes should ask the landlord to apply, or to give written consent and authority.
Tenants still deal with Nakheel directly for some permits. A tenant's move-in or move-out permit uses the Ejari and copies of the owner's Emirates ID, passport and visa, while an owner uses the title deed or sales agreement; submit it three to four working days before the move. For maintenance access, Nakheel asks for an owner or tenant NOC.
Read the NOC as a contract. It sets the approved scope and any conditions for the permit stage, and it may carry a validity period. If it is likely to lapse before works start or finish, ask Nakheel about renewal early rather than after it expires.
Any change to the design after approval needs a new or revised application. In Trakhees areas, completed modification works are closed out with a modification completion certificate after inspection, and Trakhees has a separate route to revalidate or cancel a modification approval. Keep approved drawings on site, as inspectors compare the work against them, and unapproved changes can cause problems later at resale.
Most returns come from the drawings rather than the forms. The usual causes are:
Our guide on why Nakheel approvals get rejected covers each cause and how to fix it.
The process above is broadly the same across Nakheel areas, but what Urban Planning will accept is not. On Palm Jumeirah, footprint, height, beach frontage and pool position are reviewed closely; our article on what Nakheel checks on Palm Jumeirah explains those rules.
For local detail, see the area guides for Palm Jumeirah approvals, villa works in Jumeirah Park, Al Furjan villas and townhouses and JVC and JVT renovations.
Nakheel issues a villa alteration NOC within about 4 working days once all required documents are complete. Extensive works, such as extensions or major alterations, can take around 4 to 6 weeks. Comments and resubmissions add time. The authority permit then runs on its own timeline.
No. The NOC approves the design. The work permit people ask about is the contractor access permit from Nakheel Security, which lets workers into the community and needs the approvals first.
Often. In many Nakheel communities, works affecting structure, services or built-up area need a Trakhees permit after the Nakheel NOC. Some plots fall under Dubai Municipality instead, so confirm the authority for yours.
Usually the owner applies, or someone the owner authorises in writing. A tenant should ask the landlord to apply or to give written consent before any work is planned.
Through Nakheel Online Services or the My Nakheel app, using the Urban Planning services for modifications. You can follow progress in the requests section and by email.
Send us your plot or unit number and a short description of the works. We will confirm which approvals apply, prepare the drawings and handle the Nakheel NOC and the authority permit. See how our Nakheel approval consultants manage the full file, or contact the DXB Approval Team for a quote.
On this page
RELATED SERVICE
Organise the developer consent and project documentation for modifications in an applicable Nakheel property. We help you describe the work clearly and distinguish community permissions from technical authority approvals.
Rejections and common mistakes
Why Nakheel NOC applications get rejected or returned: design guideline issues, missing drawings, unapproved works and validity, and how to fix each one.
View details
Communities and developers
Palm Jumeirah renovation rules for villas and apartments: what Nakheel checks, how the permit fits in, waterfront considerations and how to prepare.
View details
Communities and developers
JVC and Al Furjan approvals compared: villas, townhouses, apartments and shops, the Nakheel NOC, the permit authority and what to check before you design.
View details
LET’S TALK ABOUT YOUR PROJECT
Tell us the location, property type and work you have in mind.