Rejections and common mistakes

Mezzanine fire safety requirements

A mezzanine changes escape routes and fire systems below and above it. Here is what fire safety reviewers look at and how to plan for it.

A mezzanine looks like a simple way to gain floor space in a warehouse or showroom. From a fire safety point of view, it is a significant change. It adds people at height who need to escape, it can block sprinkler coverage to the floor below, and its steel structure may need fire protection to stay standing long enough for people to get out. Many mezzanine projects stall at Civil Defence review or inspection because these points were considered too late.

This guide explains the fire safety requirements that typically apply to mezzanines in Dubai, how a mezzanine changes the building's fire strategy, and how to prepare. For the wider approval process, see our guide on warehouse mezzanine approval and our warehouse and industrial approval service.

Why mezzanines matter for fire safety

  • Escape at height: people on the mezzanine need safe routes down and out
  • Increased occupancy: office mezzanines add staff to a building designed for storage
  • Sprinkler shadow: the mezzanine floor can stop sprinklers above it reaching the area below
  • Structure in fire: unprotected steel loses strength quickly in a fire
  • Combustible storage: goods stored on or under the mezzanine add fire load
  • Smoke: smoke rising from below can reach people on the mezzanine

What reviewers typically look at

Escape routes and stairs

The mezzanine must have stairs of adequate width, number and location for its size and occupancy. Travel distances from any point on the mezzanine to a stair, and then to an exit, must stay within limits. Larger mezzanines often need more than one stair. Stairs need handrails, and their design must meet the requirements for escape stairs.

Guarding

Edges must be protected with balustrades or guard rails of adequate height and strength.

Fire protection to the structure

Depending on the mezzanine's size, use and the building's fire strategy, the steel frame may need fire protection, such as intumescent paint or fire boards, to achieve a required fire resistance. The protection must be applied by competent contractors and certified.

Sprinklers and detection

If the building has sprinklers, the area under a solid mezzanine usually needs its own sprinkler coverage, because the mezzanine blocks the ceiling sprinklers. Detection must also cover both levels.

Use of the mezzanine

The intended use, whether storage, offices or retail, affects occupancy, loads and fire requirements. An office mezzanine brings different requirements from a storage mezzanine.

Emergency lighting and signage

Escape routes on and from the mezzanine need emergency lighting and exit signs.

How a mezzanine changes the fire strategy

Without mezzanineWith mezzanine
Single floor, direct escape to exitsTwo levels; escape via stairs
Sprinklers at roof level cover the floorAdditional sprinklers needed below the mezzanine
Occupancy based on storage useOccupancy may increase, especially for offices
Roof structure onlyMezzanine steel may need fire protection
Detection at one levelDetection at both levels

Because of these changes, a mezzanine is treated as a modification to the whole warehouse's fire strategy, not just an added platform.

Mezzanines in showrooms and retail

Mezzanines aren't only found in warehouses. Showrooms, retail units and restaurants use them for display areas, seating or offices. In these settings, members of the public use the mezzanine, which raises occupancy and the standard of escape provision. Glass balustrades, open stairs and feature designs must still meet guarding and escape requirements. If the mezzanine is open to the floor below, smoke from a fire downstairs can rise quickly, so detection, smoke control and escape design need particular attention. The same principle applies: involve the fire designer from the first sketch.

Questions to answer before design

  • What will the mezzanine be used for, now and in the future?
  • How many people will be on it at the busiest time?
  • What will be stored on it, and how heavy is it?
  • Does the building have sprinklers, and where are the existing heads?
  • Can the existing floor slab carry the mezzanine columns?
  • Where can stairs go so that travel distances stay within limits?

Planning steps

  1. Define the use of the mezzanine and the expected occupancy and loads.
  2. Check the existing building: its fire systems, structure and floor capacity.
  3. Design the mezzanine with stairs, guarding and escape routes within limits.
  4. Coordinate fire protection, sprinklers and detection with the fire designer.
  5. Prepare structural and fire drawings for approval.
  6. Install with approved contractors, including certified fire protection.
  7. Inspect and certify before using the mezzanine.

Common mistakes

  • Designing the mezzanine structure without involving the fire designer
  • One stair where two are needed
  • No sprinklers under a solid deck
  • Steel left unprotected where protection is required
  • Changing the mezzanine's use from storage to offices without approval
  • Overloading the mezzanine with goods beyond its design load

Frequently asked questions

Not all. It depends on the size, use and the building's fire strategy. The fire designer confirms the requirement.

If the building is sprinklered and the mezzanine has a solid floor, the area below usually needs its own sprinkler coverage.

It depends on the size, occupancy and travel distances. Larger mezzanines often need more than one.

Changing use affects occupancy and fire requirements, so it needs approval.

The applicator provides certification, and inspectors check it during inspection.

Get help with your mezzanine

Send us the warehouse details and what you plan to use the mezzanine for. We will coordinate the structural, fire and sprinkler design and manage the approvals before steel is ordered. Where we also build the structure, our steel contracting service delivers it to the approved design; see also approved steel contractor requirements.

In Jebel Ali Free Zone, these points sit alongside the JAFZA approval route.

RELATED SERVICE

Warehouse and industrial approval

Coordinate the approvals brief for warehousing, industrial fit-outs, mezzanines and racking. We help organise the actual storage and operating information that drives technical assessment.

LET’S TALK ABOUT YOUR PROJECT

A clear next step starts
with the right brief.

Tell us the location, property type and work you have in mind.

This form sends your enquiry to Dubai Authority Approvals by email. It does not submit an application to an authority. Please avoid identity documents in the initial enquiry; drawings can be shared once we reply.