Electrical, fire, HVAC and drainage drawings go to different reviewers and are checked for different things. Here is what each set needs to show, and how to keep them consistent with the architecture.
MEP drawings for approval in Dubai are four sets, each checked by a different reviewer. Electrical drawings go to DEWA with load distribution schedules and a single line diagram. Fire alarm, firefighting and life safety drawings go to Civil Defence in its standard plan format. HVAC, plumbing and drainage drawings go with the building permit set. All of them must match the architectural drawings, because reviewers compare them sheet by sheet.
This guide from the DXB Approval Team explains what each set should contain, using DEWA's electrical regulations, the UAE fire code and authority drawing lists. We prepare MEP drawings for submissions, but the content depends on the project, the authority and your engineer's design, and approval is never guaranteed. Confirm current requirements before you submit.
| Set | Main drawings | Reviewed by |
|---|---|---|
| Electrical | Load distribution schedules, single line diagram, lighting and power layouts | DEWA |
| Fire and life safety | Fire alarm, emergency lighting and firefighting layouts, riser diagrams, smoke control | Dubai Civil Defence |
| HVAC | Equipment schedule, thermal summary, layouts and risers | The building permit authority, such as Dubai Municipality or DDA |
| Plumbing and drainage | Water supply and drainage layouts and risers | The building permit authority, plus the drainage department for sewer connections |
Each reviewer works through its own process. For the stages, see our guides to the DEWA approval process and how Civil Defence approval works. For sheet sizes and file formats, see CAD drawing requirements for Dubai authorities.
DEWA's Regulations for Electrical Installations say the technical details of any installation, "large or small, new or additional", must be submitted for DEWA's approval before work starts. A DEWA enrolled consultant or electrical contractor submits them online.
The load schedule is the core of the electrical submission. DEWA asks for it in the format set out in the appendices to its regulations. Prepare one for each distribution board, showing:
The connected load and maximum demand must agree from the final boards up to the main distribution board. A total that changes between sheets is one of the quickest ways to get comments back.
A single line diagram, or SLD, shows the electrical system as one line per circuit, from DEWA's point of supply through the main distribution board to each sub-main and final board. It should show the board names, breaker ratings, cable sizes and metering arrangement, using the same names as the schedules and layouts.
Layouts show where each light, socket, isolator and board sits, with circuit references that match the schedules. The DB locations must match a room on the architectural plans, with enough space around them.
DEWA's regulations set rules that the drawings and schedules have to follow:
| Item | DEWA rule |
|---|---|
| Lighting and fan circuits | Maximum 2,000 W per circuit, protected at up to 16 A |
| Lighting point, fittings not yet selected | At least 100 W per point |
| 13 A general-purpose socket, other than kitchen | At least 200 W per point; twin sockets count as two |
| Air conditioners and fixed equipment | The actual load of each item |
| Distribution boards | Rated for the total connected load, before a demand factor is applied |
| Demand factor | Worked out by a suitably qualified electrical engineer |
| Power factor | Kept between 0.9 lagging and unity, with 0.95 lagging recommended |
| Substation | Usually needed in the building or plot when the connected load is over 400 kW |
| Standby generator | Full equipment, circuit and wiring details submitted, with interlocks that stop it running in parallel with DEWA's supply |
DEWA's Building NOC and the building permit come before the electricity connection application. Our DEWA approval page covers the services behind a connection.
Chapter 19 of the UAE Fire and Life Safety Code of Practice sets out what consultants must submit to Civil Defence. Submissions that don't follow it aren't reviewed. For a consultant's design submission, the chapter lists:
Every plan uses the Civil Defence Standard Legends, shown at the right corner of each page. Consultants also provide a declaration that the fire systems will be finalised from the contractor's shop drawings, using detailed calculations.
Later, the contractor's shop drawings must be based on the approved consultant design and carry the consultant's stamp and signature. For fire alarm and voice evacuation, they add wiring diagrams, interfacing details and product specifications. Smaller tenant fit-outs prepared by décor companies follow a lighter list on A3 sheets.
HVAC drawings show how the building is cooled and ventilated, and the thermal figures behind it. DDA's drawing list for a final design submission is a useful guide to what a full set contains:
The thermal figures connect HVAC to Dubai's green building rules, because envelope performance drives the cooling load. See our Al Sa'fat compliance page for how those requirements affect a permit.
In fit-outs, the HVAC set usually focuses on the changes: new or relocated units, duct routes, fresh air and extract, especially kitchen exhaust in F&B units. Show the connection to the base building system, and check it against the landlord's capacity before you submit.
Plumbing and drainage drawings show how water comes in and how wastewater and rainwater leave. A typical set, following DDA's list, includes:
Dubai Municipality's Local Order No. 8 of 2002 explains why the drainage drawings matter. Connecting a building's private sewerage network to the public network needs prior approval. Building a private sewerage network needs a permit, applied for with plans and detailed drawings. Changing or diverting rainwater drainage pipes needs written approval.
For the water supply, DEWA's water connection service asks for approved shop drawings and premises details, submitted by an enrolled consultant or contractor.
Most MEP comments aren't about engineering. They come from drawings that don't agree with each other or with the architecture. Before you submit, check that:
A coordinated services drawing, overlaying all trades in tight areas such as corridors and plant rooms, catches most clashes before the reviewer does. Our MEP CAD drafting service prepares these drawings.
DEWA's regulations say enrolled consultants and electrical contractors submit electricity applications online. The demand factor in the load schedule has to be worked out by a suitably qualified electrical engineer.
They need drawings for whatever changes. DEWA's regulations cover any new or additional installation, large or small, so even a small electrical change needs its details submitted. For fire systems, the code sets a lighter A3 format for décor company submissions, but layouts, riser diagrams and the extinguisher layout are still required.
It is a simplified drawing of the whole electrical system, with one line per circuit. It runs from DEWA's point of supply to the main board, sub-main boards and final boards, and shows ratings, cable sizes and metering. It should match the load schedules exactly.
Where sprinklers are part of the design, yes, but the detailed calculations usually come at the contractor's shop drawing stage. The fire code asks consultants to declare that fire systems will be finalised from the contractor's shop drawings using detailed calculations.
DEWA's regulations say a substation is generally needed in the building or plot when the total connected load is over 400 kW. DEWA can ask for one at lower loads, and confirms it in the Building NOC.
Usually the building permit authority, such as Dubai Municipality or DDA, as part of the permit set. Fire-related HVAC items, such as smoke control and pressurisation, also go to Civil Defence.
Tell us what you are building or changing, and send the architectural drawings and any engineer's mark-ups. We prepare load schedules, single line diagrams, fire layouts and services drawings that match the architecture. See MEP design and approvals for the full service.
On this page
RELATED SERVICE
Load schedules, single line diagrams, fire layouts and coordinated services drawings that match your architectural set.
Authority guides
The DEWA approval process step by step: load calculation, building NOC, design approval, connection and solar, with what to prepare for each stage.
View details
Authority guides
How Dubai Civil Defence approval works, from design review and NOC to installation, inspection and completion, with what each stage needs and why delays happen.
View details
Fees, timelines and documents
What DDA, Trakhees, Civil Defence and Dubai Municipality expect from CAD submissions: sheet size, file format, title block, scales and layers.
View details
LET’S TALK ABOUT YOUR PROJECT
Tell us the location, property type and work you have in mind.