Fees, timelines and documents

Checklists, documents, fees and timeframes for Dubai approvals, shown as estimated ranges so you can plan realistically.

Planning time and budget for approvals

Two things decide how long an approval takes: how complete the submission is, and how many rounds of comments it goes through. Authority review periods are usually a matter of days or a few weeks per stage, but missing documents, drawings that don't match each other and late NOCs can add much more. Fees vary by authority, project size and scope, so we show them as estimated ranges rather than fixed figures.

The guides below list the documents each authority usually asks for, the stages a permit passes through and the costs that are easy to overlook. Use them to build a realistic programme before you sign a lease or a contractor's start date. For the overall picture, read how long a building permit takes in Dubai, and see how we work for the stages we manage on a project.

Fees, timelines and documents

Unauthorised villa extension in Dubai: how to regularise it

Built an extension without approval, or bought a villa with one? How regularisation works in Dubai: survey, structural check, NOC, permit and fines.

View details

Fees, timelines and documents

Do you need a structural report for your villa in Dubai?

When a villa in Dubai needs a structural report: removing walls, adding a floor, cracks, older homes and repairs, plus what the engineer checks.

View details

Fees, timelines and documents

MEP drawings for approval in Dubai: what each set must show

What MEP drawings for approval in Dubai must show: DEWA load schedules and single line diagrams, Civil Defence fire layouts, HVAC and drainage sets.

View details

Fees, timelines and documents

CAD drawing requirements for Dubai authority submissions

What DDA, Trakhees, Civil Defence and Dubai Municipality expect from CAD submissions: sheet size, file format, title block, scales and layers.

View details

Fees, timelines and documents

Shop drawings vs as-built drawings: what is the difference?

Shop drawings show how work will be built; as-built drawings record what was built. See who prepares each, who reviews them and what Dubai authorities need.

View details

Fees, timelines and documents

How to get villa drawings in Dubai

Lost the original drawings for your Dubai villa? Where to request them, what to do if none exist, and how a survey and CAD redraw replace them.

View details

Fees, timelines and documents

DM approval checklist: documents, fees, timelines

A practical Dubai Municipality approval checklist: owner documents, drawings, NOCs, estimated fees and review times, organised by stage so nothing stalls.

View details

Fees, timelines and documents

DCD approval checklist and inspection items

A practical Civil Defence inspection checklist for Dubai: what inspectors check on fire alarms, sprinklers, exits, emergency lighting, doors and documents.

View details

Fees, timelines and documents

Documents required for TECOM approval

The documents required for a DDA fit-out permit in TECOM business districts: tenancy, contractor, landlord NOC and drawings, and how to keep them consistent.

View details

Fees, timelines and documents

Drawing approval in Dubai: DM, DDA, Trakhees, DCD steps

How drawing approval works in Dubai across Dubai Municipality, DDA, Trakhees and Civil Defence: who reviews what, the steps and how to prepare a package.

View details

Fees, timelines and documents

Warehouse fit-out cost and hidden costs

Warehouse fit-out cost in Dubai: the main cost components, the hidden costs that catch tenants out, and how to separate fit-out from operations.

View details

Fees, timelines and documents

How long does a building permit take in Dubai

How long a building permit takes in Dubai: authority review times by authority, plus the design, NOC and comment stages that decide the real programme.

View details

Services related to these guides

LET’S TALK ABOUT YOUR PROJECT

A clear next step starts
with the right brief.

Tell us the location, property type and work you have in mind.

This form sends your enquiry to Dubai Authority Approvals by email. It does not submit an application to an authority. Please avoid identity documents in the initial enquiry; drawings can be shared once we reply.