A fit-out involves more than one permission. Here is a plain guide for first-time tenants: who approves what, in what order, and how to keep track.
For a first-time tenant, a fit-out can feel like a maze. The landlord has guidelines, the authority wants a permit, Civil Defence wants fire drawings, and the business licence depends on the fit-out being completed. Each permission has its own issuer, documents and timing. Missing one, or getting the order wrong, delays opening day.
This guide explains the permissions involved in a typical commercial fit-out in Dubai, who issues them, the order they usually come in and how to keep track of them with a simple register. For a detailed look at which authority approves fit-outs where, see our fit-out permits service.
A fit-out turns an empty or previously used unit into a space ready for your business: partitions, ceilings, floors, lighting, power, air conditioning, plumbing, fire systems, joinery and finishes. Fit-outs range from a light refresh of an existing office to a full build from shell and core.
| Permission | Issued by | What it covers |
|---|---|---|
| Landlord NOC | Landlord or building owner | Consent to the fit-out design and works in their building |
| Fit-out permit | The authority for the area, such as Dubai Municipality, DDA, Trakhees or a free zone authority | Regulatory approval of the fit-out drawings |
| Civil Defence approval | Dubai Civil Defence, directly or through the authority | Fire and life safety design and installation |
| Utility approvals | DEWA and others where loads or connections change | Electrical and water supply changes |
| Sector approvals | Regulators such as food safety or health authorities | Requirements for specific business types |
| Building management work permits | Building management | Access, working hours and site rules |
| Fit-out completion certificate | The authority | Confirms the works match the approval |
Not every fit-out needs all of these, but most need several.
A permission register is a simple table listing every approval the project needs, with columns for:
Reviewing the register weekly makes it obvious what is holding things up and what needs action next.
In 2027, times vary by authority and project. As a guide, review typically takes an estimated 3 to 7 working days for Dubai Municipality, 7 to 15 working days for DDA and 8 to 20 days for Trakhees once a complete application is submitted, with Civil Defence typically an estimated 15 to 20 working days. The landlord's review, design, comment rounds, works and completion add to the overall programme.
The contractor often submits the fit-out permit and builds the works, so the choice matters for approvals as well as quality. Before appointing, check that the contractor is registered with the authority for your area and, where the building requires it, on the landlord's approved list. Ask how they will handle the landlord NOC, the permit and Civil Defence, and who on their team will manage approvals. Check that fire systems will be installed by an approved specialist. A contractor who understands the approval route can save weeks; one who doesn't can stall the project at the first submission.
Most commercial fit-outs need some form of approval. Minor works may have simpler routes, but check with the landlord and authority.
Usually the fit-out contractor or consultant registered with the authority, with the tenant's documents and landlord NOC.
No. Works should start after the permit and building management work permit are issued.
Most commercial fit-outs affect fire and life safety, so Civil Defence is usually involved.
Inspections lead to the fit-out completion certificate, which often feeds into your trade or sector licence.
Send us the unit details and your business type. We will build your permission register, prepare the drawings and coordinate the landlord, authority, Civil Defence and sector approvals.
In JLT, fit-outs also need the community's approval; see the Concordia fit-out NOC.
Mall units follow a different route, where the mall operator approves the design and most interior works are exempt from the municipal permit. See our guide to fitting out a shop in a Dubai mall.
RELATED SERVICE
Prepare the approvals route for interior works in an existing property. We help coordinate the tenant, owner, design team and contractor so the proposed changes are described consistently.
Permit and NOC guides
The Dubai Municipality self-decor permit explained: which interior works qualify, which don't, what you need and the fees, so you choose the right route.
View details
Permit and NOC guides
Fix occupancy and layout assumptions before the drawings.
View details
Authority guides
Design review versus readiness to operate.
View details
LET’S TALK ABOUT YOUR PROJECT
Tell us the location, property type and work you have in mind.