Before a clinic or pharmacy can open, DHA checks the facility type, the premises, the layout and the inspection results. Here is a checklist of the licensing requirements and how they connect to the fit-out.
Opening a clinic, medical centre, dental practice or pharmacy in Dubai involves two parallel tracks: the health facility licence from the Dubai Health Authority (DHA), and the building and fit-out approvals for the premises. The two are closely linked. The facility type decides the rooms, sizes and equipment the layout must provide, and the layout must be approved before the facility can be inspected and licensed.
This guide explains the DHA licensing steps for clinics and pharmacies, how they connect to the fit-out, and the mistakes that cause rework. For project support, see our DHA approval service and our clinic and pharmacy fit-out approval service.
DHA licenses specific facility types, such as general clinics, specialised clinics, polyclinics, dental clinics, day surgery centres, diagnostic centres and pharmacies. Each type has its own requirements for rooms, space, equipment, staffing and services. Defining the facility type and the services you will offer is the first decision, because everything else follows from it.
A common mistake is designing a layout before the facility type and services are settled, then discovering that a required room or minimum size is missing.
The process is managed through DHA's online system, and typically includes:
Consultation, examination and treatment rooms of adequate size, with handwashing facilities and appropriate finishes.
Clean and dirty utility areas, sterilisation where relevant, waste management and finishes that can be cleaned easily.
Reception and waiting, separation of patient and staff areas, and privacy in clinical spaces.
Accessible entrances, toilets and circulation for patients with limited mobility.
Dispensing area, storage with temperature control where needed, controlled medicines storage and customer areas.
Medical gases where required, power for equipment, ventilation and plumbing suited to clinical use.
| Track | Key approvals |
|---|---|
| DHA facility licence | Initial approval, layout review, inspection, facility licence |
| Building and fit-out | Landlord NOC, fit-out permit, Civil Defence, completion |
Both tracks must agree. The fit-out drawings must reflect the DHA-approved layout, and DHA inspection usually follows fit-out completion.
The premises can make or break a clinic project, and the checks are different from those for an ordinary office:
A short suitability review before signing a lease is far cheaper than discovering after design that the unit can't accommodate the facility type you planned.
For 2027 openings, the DHA track and the fit-out track run in parallel, and the slowest step decides the opening date. Initial approval and layout review happen first; landlord, fit-out permit and Civil Defence follow; construction comes next; then fit-out completion, DHA inspection and the licence. Professional licences for the doctors, nurses and pharmacists should be progressed at the same time, so staff are licensed when the premises are ready. Planning the two tracks on one programme, with clear owners for each step, is the most reliable way to open on time.
It is best to obtain DHA's layout approval before building, so the fit-out matches the requirements.
Not always. The building's use, the landlord's consent and the space must suit a health facility.
A designer or consultant familiar with DHA requirements, working with the medical team.
Yes. Pharmacies have their own requirements for dispensing, storage and controlled medicines.
Usually after the fit-out is complete and the facility is ready to operate.
Adding services, such as a new specialty or procedure room, usually needs DHA approval and may require layout changes. Plan likely future services into the original layout where you can.
Send us your facility type, services and the premises you are considering. We will check suitability, prepare the layout to DHA requirements and coordinate the fit-out approvals so both tracks stay aligned. Our fit-out approval guide for tenants explains how the landlord, permit and Civil Defence steps fit around the DHA licence.
RELATED SERVICE
Connect your healthcare facility brief with the relevant licensing and fit-out requirements. We help organise the design information and coordinate the questions that must be resolved before opening.
Business setup and licensing
Match the room schedule to the treatments you offer.
View details
Authority guides
Design review versus readiness to operate.
View details
Permit and NOC guides
The permits involved and a register for every permission.
View details
LET’S TALK ABOUT YOUR PROJECT
Tell us the location, property type and work you have in mind.