Services · Drawings & design

Drawings and design for approval

Authorities approve drawings, not intentions. Clear, coordinated, code-compliant drawings make the most difference to how quickly an application moves.

Design services

From a single structural assessment to the full design of a new building.

Engineering drawings

Architectural, structural, MEP and fire drawing packages prepared to the Dubai Building Code and organised for DM, Trakhees, DDA, DCD and DEWA review.

Learn more

CAD drafting

Architectural, structural and MEP drawings drafted in AutoCAD from your sketches, mark-ups, PDFs or engineer's design, plus PDF to DWG conversion.

Learn more

Villa design

New villa design in Dubai from plot brief to permit-ready drawings: Dubai Building Code Part K, Al Sa'fat, structure and MEP, coordinated for authority review.

Learn more

Building design

Design of residential towers, commercial, mixed-use and industrial buildings in Dubai, coordinated across disciplines and staged for concept and permit approval.

Learn more

MEP design

MEP design for Dubai projects: DEWA load schedules, plumbing and drainage, HVAC, and Civil Defence fire systems, coordinated for permit approval.

Learn more

Swimming pool

Private and shared pool design in Dubai: structure, filtration, drainage, electrical safety and barriers, drawn for developer and authority approval.

Learn more

Infrastructure design

Site access, internal roads, parking layouts and stormwater drainage designed for RTA, Dubai Municipality and utility NOCs. Drawings, process and pitfalls.

Learn more

As-built drawings

Measured as-built surveys and drawings for Dubai villas, units and buildings: for completion certificates, resale, new permits and regularising unapproved works.

Learn more

Shop drawings

Joinery, steel, MEP and fit-out shop drawings for contractors, prepared for consultant review and revised to comments.

Learn more

Structural evaluation

Structural assessment for extensions, added loads, defects and Dubai's 2026 building quality and safety law: site surveys, testing, reports and approvals.

Learn more

Interior design

Interior layouts, partitions, ceilings and finishes drawn for Dubai fit-out approvals: space planning that meets fire, accessibility and authority rules.

Learn more

What makes a drawing package approval-ready

  • Based on verified site information: the site plan, survey and existing approved drawings, not assumptions.
  • Compliant with the Dubai Building Code, mandatory for designs permitted in Dubai since the 2021 edition took effect, and with the Al Sa'fat green building requirements where they apply.
  • Coordinated across disciplines, so architectural, structural and MEP drawings tell the same story and area tables match the plans.
  • Clear about change: for modifications, existing, demolished and proposed elements are shown unambiguously.
  • Prepared for the specific reviewer, whether that is a master developer, Dubai Municipality, Trakhees, a free zone, or Civil Defence.

Our drawing services connect directly to the approval routes on our permits and NOCs and authority approvals pages.

Choosing the right drawing service

The right drawing service depends on what you have and what the authority needs to see. If the building exists but the drawings don't, start with an as-built survey, or turn old scans into editable files through PDF to CAD conversion. If you are planning changes, engineering drawings for authority approval cover the architectural, structural and MEP set. Contractors who need fabrication details use shop drawings, and consultants with a busy design office can use our CAD drafting services for extra capacity.

For existing buildings, a structural evaluation is often needed before any removal of walls, new openings or added floors. For new projects, villa design and building design take the brief from concept to permit drawings.

What you receive

Drawings are delivered as PDF sets for submission and as AutoCAD DWG files, so your team or contractor can keep working on them. Each set is checked against the site plan and the authority's requirements before it is issued, and revisions after comments are tracked so the developer NOC, authority permit and site all use the same version. Our guide to drawing approval in Dubai explains how drawings move through DM, DDA, Trakhees and Civil Defence.

Tell us about your project

Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.

  • A practical answer on which authority and NOCs apply
  • A clear list of the documents and drawings to prepare
  • A written scope and quotation for our consultancy work
This form sends your enquiry to Dubai Authority Approvals by email. It does not submit an application to an authority. Please avoid identity documents in the initial enquiry; drawings can be shared once we reply.