Communities · Master developer: Dubai Properties (Dubai Holding)
Business Bay's canal-side towers mix offices, hotel apartments, residences and street-level retail, each run by its own building management. We prepare fit-out drawings, collect the building NOC and coordinate the authority permits for offices, shops, restaurants and apartments.
Business Bay has dozens of developers but one master plan. Every unit sits inside a tower owned and run by someone different, so the first approval you need is often not from a government authority at all. It is from the building's management, and its rules can vary a lot from one tower to the next.
| Master developer | Dubai Properties, part of Dubai Holding Real Estate. Individual towers were built by many different developers. |
|---|---|
| Master community management | Dubai Holding Community Management lists Business Bay and Bay Square among the master communities it manages |
| Permit authority | Business Bay is a mainland district, and Dubai Municipality is generally the authority for building and decoration permits, with Dubai Civil Defence for fire and life safety. We confirm the authority for each plot before submission. |
| Typical projects | Office fit-outs, canal-front restaurants and cafés, showrooms, hotel-apartment and residential renovations |
The tower's owners' association or developer reviews your drawings against its fit-out guide. It sets out how you connect to the floor's fire alarm, sprinklers and chilled water, plus working hours, deposits and lift use.
A decoration (fit-out) permit is required for non-structural interior works in commercial and office units over 100 m². Units of 100 m² or less, and units inside malls, are exempt under Administrative Resolution No. 85 of 2019.
Fire and life-safety drawings for alarm, sprinkler, exit and emergency lighting changes, followed by inspection. See Civil Defence approvals.
Under Resolution 85/2019, the decoration permit is filed by a Dubai Municipality-approved contractor. Dubai Municipality lists the self-decor permit as an instant service once the submission is complete. We prepare the drawings and coordinate submission through the appointed contractor, and the authority makes the decision. The full process is on our Dubai Municipality approval page and in our self-decor permit guide.
Many Business Bay office floors are handed over as shell and core. The fit-out has to bring in everything from the raised floor or screed to final ceilings, so the drawing package is larger than for a refurbishment. Things that often come up:
See office fit-out approvals for the design and documentation side.
The Dubai Water Canal and its promenade have made Business Bay's ground floors popular for cafés and restaurants. They are also the units most likely to run into problems late. Kitchen extract has to discharge somewhere the tower allows, often at high level through a shaft that may not exist. Outdoor seating on a promenade or podium may belong to the building, the master community or a public authority, and each needs its own permission. Gas, grease traps and fire suppression also have to be designed in. Our restaurant and F&B approvals and retail and showroom pages cover these in detail. Shopfront signage is a separate permit, covered on our signage permits page.
Residential and serviced-apartment towers in Business Bay usually allow kitchen, bathroom, flooring and joinery upgrades with a building NOC. Moving wet areas, adding partitions that affect sprinkler or smoke-detector coverage, or enclosing balconies is treated more seriously. Under Law No. 6 of 2019 on jointly owned property, changes to structure or external appearance need master developer, Dubai Land Department and competent authority approval. Hotel-apartment units may also be bound by the operator's brand standards and rental-pool agreement.
No. Business Bay is a mainland district, so businesses usually hold a Dubai mainland licence, and fit-outs generally follow the Dubai Municipality and Civil Defence route. We confirm the authority for your plot before submitting.
Administrative Resolution No. 85 of 2019 exempts units of 100 m² or less from the decoration permit. The building's own NOC and any Civil Defence requirements for changes to fire systems still apply.
Usually the tower's owners' association, its appointed property manager or the developer that still manages the building. The fit-out guide for your tower names the contact and lists the deposit and documents.
It depends on the building's review cycle, how complete the drawings are, and whether Civil Defence or other authority approvals are needed. We give an estimate once we have seen the unit and the scope.
On this page
Fitting out in Business Bay?
Tell us the tower, unit size and intended use.
Service
Fit-out approval for commercial and residential units in Dubai: landlord NOC, DM, DDA or Trakhees permit, Civil Defence, documents, process and completion.
Read more
Service
Office fit-out approvals in Dubai: occupancy and escape, partitions, server rooms, MEP loads, landlord NOC and the DM, DDA or free zone permit for your office.
Read more
Service
Get support for Dubai Municipality approval: drawings, NOCs, permits, submissions and completion coordination. Check the approval route for your project.
Read more
Service
DCD approval support in Dubai for fire and life-safety drawings, fire alarm and firefighting coordination, submissions, inspections and completion.
Read more
Service
Restaurant and café approvals in Dubai: food-safety layout assessment, hood suppression, grease traps, exhaust, LPG and Civil Defence, planned before you build.
Read more
Guide
A practical fit-out register lists each permission, issuer, scope, owner and status.
Read more
Guide
Self-decor is a label that should not be used as a shortcut for every interior alteration.
Read more
Guide
An office plan should reflect the number of people, meeting-room use and specialist spaces the business expects.
Read more
Guide
Apartment works can interact with common pipes, ventilation, fire systems and neighbouring units.
Read more
Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.