Fees, timelines and documents

Documents required for TECOM approval

DDA’s fit-out page lists documentary inputs including the contractor appointment, EJARI, owner NOC and relevant drawings.

Keep applicant documents and drawings consistent

DDA’s fit-out page lists documentary inputs including the contractor appointment, EJARI, owner NOC and relevant drawings. Check matching names, property references and current revisions before submission. A technically sound drawing package can still be difficult to process if the applicant information describes a different unit or an earlier scope.

Your practical preparation checklist

Apply the guidance to the actual property

A tenant moving into a shell-and-core office should obtain the landlord’s technical information before designing the ceiling. Available services, access rules and the proposed work package can change the submission strategy.

Use this as a planning example, not a reported client project or a predetermined authority outcome. Record the facts that are specific to your premises, including the latest approved condition and the exact work proposed. If information is missing, identify who can supply it before design or procurement depends on an assumption.

Questions worth resolving early

TECOM-related property arrangements and DDA building-control services are not interchangeable approvals. Confirm the building and applicable route. DDA’s published fit-out service lists tenant appointment, EJARI, owner consent, relevant NOCs, and existing approved and proposed drawings. Structural changes need specific assessment rather than an assumption that the interior permit covers them.

Ask the responsible professional to identify which questions need official confirmation and which are design or coordination decisions. Keep a written record of the source and date of any project-specific instruction. Where a requirement is unclear, confirm it through the relevant official service rather than relying on an undated checklist or another property’s approval.

Make the next discussion productive

Prepare a short project note with the location, proposed activity, available records and decisions still outstanding. Include the latest reviewer comments if an application is already in progress. A concise, accurate brief helps the next discussion focus on the real obstacle rather than repeating background information.

Get help with the next step

For project-specific assistance, explore dda / tecom approval in Dubai. You can then share your property location and proposed work through our WhatsApp enquiry form. A discussion of the scope does not constitute authority approval.

Official references

Use the current service requirements for your property and scope. Reference pages checked 2 October 2026.

RELATED SERVICE

DDA / TECOM approval

Plan a fit-out within the relevant Dubai Development Authority jurisdiction with a coordinated drawing and document package. We help clarify landlord requirements, the permit scope and the information needed from your appointed contractor.

LET’S TALK ABOUT YOUR PROJECT

A clear next step starts
with the right brief.

Tell us the location, property type and work you have in mind.

This form sends your enquiry to Dubai Authority Approvals by email. It does not submit an application to an authority. Please avoid identity documents in the initial enquiry; drawings can be shared once we reply.