DHA licensing requirements: a checklist for clinics and pharmacies

Before a clinic or pharmacy can open, DHA checks the facility type, the premises, the layout and the inspection results. Here is a checklist of the licensing requirements and how they connect to the fit-out.

Opening a clinic, medical centre, dental practice or pharmacy in Dubai involves two parallel tracks: the health facility licence from the Dubai Health Authority (DHA), and the building and fit-out approvals for the premises. The two are closely linked. The facility type decides the rooms, sizes and equipment the layout must provide, and the layout must be approved before the facility can be inspected and licensed.

This guide explains the DHA licensing steps for clinics and pharmacies, how they connect to the fit-out, and the mistakes that cause rework. For project support, see our DHA approval service and our clinic and pharmacy fit-out approval service.

Start with the facility type

DHA licenses specific facility types, such as general clinics, specialised clinics, polyclinics, dental clinics, day surgery centres, diagnostic centres and pharmacies. Each type has its own requirements for rooms, space, equipment, staffing and services. Defining the facility type and the services you will offer is the first decision, because everything else follows from it.

A common mistake is designing a layout before the facility type and services are settled, then discovering that a required room or minimum size is missing.

The licensing steps

The process is managed through DHA's online system, and typically includes:

  1. Initial approval. Apply for initial approval of the facility, describing the type, services and location.
  2. Premises and layout. Prepare the layout to meet DHA's design requirements for the facility type.
  3. Design review. Submit the layout and supporting documents for DHA review.
  4. Fit-out approvals. Obtain the landlord NOC, the authority's fit-out permit and Civil Defence approval for the premises.
  5. Fit-out works. Build the premises to the approved design.
  6. Staff licensing. Healthcare professionals must hold the relevant DHA professional licences.
  7. Inspection. DHA inspects the completed facility, its equipment and its readiness.
  8. Facility licence. Once requirements are met, DHA issues the facility licence.

What the layout must address

Clinical rooms

Consultation, examination and treatment rooms of adequate size, with handwashing facilities and appropriate finishes.

Infection control

Clean and dirty utility areas, sterilisation where relevant, waste management and finishes that can be cleaned easily.

Patient flow and privacy

Reception and waiting, separation of patient and staff areas, and privacy in clinical spaces.

Accessibility

Accessible entrances, toilets and circulation for patients with limited mobility.

Pharmacies

Dispensing area, storage with temperature control where needed, controlled medicines storage and customer areas.

Services

Medical gases where required, power for equipment, ventilation and plumbing suited to clinical use.

How DHA licensing connects to the fit-out

TrackKey approvals
DHA facility licenceInitial approval, layout review, inspection, facility licence
Building and fit-outLandlord NOC, fit-out permit, Civil Defence, completion

Both tracks must agree. The fit-out drawings must reflect the DHA-approved layout, and DHA inspection usually follows fit-out completion.

Choosing premises for a health facility

The premises can make or break a clinic project, and the checks are different from those for an ordinary office:

  • Building use and landlord consent. Confirm the landlord allows a health facility and that the building's approved use supports it. Some buildings restrict medical uses.
  • Size and shape. The required rooms, corridors and waiting areas need enough floor area, and long narrow units can make patient flow difficult.
  • Accessibility. Patients must be able to reach the clinic without steps, with lift access on upper floors and accessible parking or drop-off nearby.
  • Services. Check power capacity for equipment, water and drainage for clinical sinks, and ventilation. Imaging equipment such as X-ray has additional structural and shielding needs.
  • Visibility and access hours. Practical for patients, and compatible with the building's operating hours.

A short suitability review before signing a lease is far cheaper than discovering after design that the unit can't accommodate the facility type you planned.

Licensing timeline in practice for 2027

For 2027 openings, the DHA track and the fit-out track run in parallel, and the slowest step decides the opening date. Initial approval and layout review happen first; landlord, fit-out permit and Civil Defence follow; construction comes next; then fit-out completion, DHA inspection and the licence. Professional licences for the doctors, nurses and pharmacists should be progressed at the same time, so staff are licensed when the premises are ready. Planning the two tracks on one programme, with clear owners for each step, is the most reliable way to open on time.

Common mistakes

  • Designing before defining the facility type and services
  • Choosing premises that are too small for the required rooms
  • Missing infection control areas
  • Ignoring accessibility requirements
  • Building the fit-out before DHA layout approval
  • Staff licences not ready when the facility is ready for inspection

Frequently asked questions

It is best to obtain DHA's layout approval before building, so the fit-out matches the requirements.

Not always. The building's use, the landlord's consent and the space must suit a health facility.

A designer or consultant familiar with DHA requirements, working with the medical team.

Yes. Pharmacies have their own requirements for dispensing, storage and controlled medicines.

Usually after the fit-out is complete and the facility is ready to operate.

Adding services, such as a new specialty or procedure room, usually needs DHA approval and may require layout changes. Plan likely future services into the original layout where you can.

Get help with your clinic or pharmacy

Send us your facility type, services and the premises you are considering. We will check suitability, prepare the layout to DHA requirements and coordinate the fit-out approvals so both tracks stay aligned. Our fit-out approval guide for tenants explains how the landlord, permit and Civil Defence steps fit around the DHA licence.

RELATED SERVICE

DHA facility approval support

Connect your healthcare facility brief with the relevant licensing and fit-out requirements. We help organise the design information and coordinate the questions that must be resolved before opening.

LET’S TALK ABOUT YOUR PROJECT

A clear next step starts
with the right brief.

Tell us the location, property type and work you have in mind.

This form sends your enquiry to Dubai Authority Approvals by email. It does not submit an application to an authority. Please avoid identity documents in the initial enquiry; drawings can be shared once we reply.