For plot owners and developers building a villa, a building or a warehouse, or adding to one. We check the plot, prepare the drawings, and coordinate the developer NOC, building permit, service NOCs and completion certificate.
Construction in Dubai can only start once the authority that controls the plot has approved the design and issued a building permit, with NOCs from Civil Defence, DEWA, RTA and, in master communities, the developer. We check the plot, prepare or review the drawings, coordinate the permit submission through a registered consultant and follow the project through its inspections to the completion certificate, for villas, buildings, warehouses and additions.
This page is written by the DXB Approval Team. We prepare architectural, structural and MEP drawings and handle building permits, developer NOCs and authority approvals with Dubai Municipality, the Dubai Development Authority, Trakhees and the other zone authorities. The authorities decide every application, so the timings on this page are typical ranges, not promises.
Most construction approvals are delayed for the same few reasons: the wrong authority, a design that ignores the plot rules, or an NOC requested too late. Our work is to get the order right, so each submission reaches the reviewer complete.
For a full explanation of how permits work, read our guide on how to get a building permit in Dubai. This page explains what we do on your project and how we work.
We get the current affection plan or site plan and read it with you: the land use, height, setbacks, plot coverage, parking and access. We also confirm which authority issues the permit, and any community rules from the master developer.
Our architects and engineers prepare the architectural, structural and MEP drawings to the Dubai Building Code and the plot rules, or check a package your designer has already drawn. For Dubai Municipality projects we include Al Sa'fat green building compliance.
In communities such as those of Emaar and Nakheel, the developer reviews the design first. We submit it, answer the comments and get the NOC the authority asks for.
The package is submitted on the authority's online platform by a registered engineering consultant. We prepare the submission and track the review, revise the drawings for each comment round and follow it through to the permit.
We coordinate the Civil Defence fire and life-safety approval, the DEWA building NOC and load, RTA access and road NOCs, and the telecom NOCs. Our NOC coordination service tracks them in one place.
Before the main works, a site may need a demolition permit, excavation and shoring permits, a groundwater discharge NOC or a sand transfer permit. We plan them into the programme so the site does not stop waiting for one.
During construction we help the contractor prepare for the stage inspections. At the end we put together the as-built drawings, test records and service clearances for the completion certificate.
The stages are the same for every project, but the main approvals change with what you build.
| Project | What usually drives the approval | More detail |
|---|---|---|
| New villa | Plot rules, the developer's design guidelines and Part K of the Dubai Building Code | New villa permits |
| Residential or commercial building | Height, parking, fire safety and a larger structural package | Building design |
| Warehouse or industrial building | Zone authority rules, fire safety for storage, and loading and access | Warehouse approvals |
| Extension or extra floor | The existing approved drawings, structural checks and the developer NOC | Villa renovation and extension |
| Basement | Soil investigation, shoring, excavation and groundwater discharge | Basement approval guide |
| Swimming pool | Setbacks, structure, safety barriers and the drainage connection | Swimming pool approval |
If your project is a change inside an existing unit rather than new construction, a fit-out or modification permit is usually the right route instead.
The permit comes from the authority that controls the land. The affection plan or site plan names it.
| Where the plot is | Who issues the building permit |
|---|---|
| Most of mainland Dubai, including many master communities | Dubai Municipality |
| Dubai Internet City, Media City, Studio City, Knowledge Park and other DDA areas | Dubai Development Authority |
| Jebel Ali Free Zone and other Ports, Customs and Free Zone Corporation areas | Trakhees |
| Dubai South and its districts | Dubai South |
| Dubai Silicon Oasis | Dubai Silicon Oasis Authority |
In a master community, the developer's NOC comes before the authority submission, whichever authority issues the permit.
We read the affection plan, confirm the authority and developer rules, and agree what you want to build.
Our team + you
You appoint the registered consultant and the licensed contractor. We can work as your design team or alongside your own consultant.
You · consultant · contractor
Boreholes and a site survey give the data the structural design and any shoring or dewatering depend on.
Specialist · our team
Architectural, structural and MEP drawings to the Dubai Building Code, the plot rules and the green building rules.
Our team · consultant
In master communities, the developer reviews the design and issues its NOC before the authority submission.
Developer · our team
The authority reviews the design and the service authorities issue their NOCs. We answer each comment round.
Authorities · consultant
With the design approved and the NOCs in, the permit is issued and the plot is demarcated before work starts.
Authority · consultant
Stage inspections during the works, then the as-built drawings and service clearances for the completion certificate.
Contractor · our team
Do not have all of these yet? Send us what you have. The affection plan and the title deed are enough to start the plot check.
Building permit fees are mostly based on the built-up area, so they depend on the size of the project. These are the figures to plan with.
| Item | Typical time | Fees |
|---|---|---|
| Dubai Municipality, new building permit | Typically 3 to 5 working days once the design and NOCs are approved | Based on the built-up area |
| Dubai Municipality, modifications and additions | Typically 3 to 7 working days | Typically AED 300 to 1,500 |
| DDA approvals | Typically 7 to 15 working days | Typically AED 1,020 to 3,000 |
| DDA final design approval | Typically 5 to 7 working days | Typically AED 0.10 per sq ft of built-up area (min AED 200, max AED 50,000) |
| DDA final building permit | Typically 2 to 4 working days | Typically AED 1.00 per sq ft of built-up area (min AED 200), less fees paid earlier |
| DDA excavation and shoring permits | Typically 3 to 5 working days each | Excavation typically AED 5,000, or AED 1,000 for villas; shoring typically AED 0.05 per sq ft |
| Trakhees approvals | Typically 8 to 20 days | Typically AED 1,500 to 4,000 |
| Civil Defence approval | Typically 15 to 20 working days | Typically around AED 1,000 |
| Our design and approval work | Depends on the project | Quoted after the plot check |
These are review times once a complete package is in. The full programme is longer, because design, the soil investigation, developer review and comment rounds take most of the time. On DDA land the building permit is valid for 4 years, and permits elsewhere also expire, so plan the start of works around it.
For the design itself, see our building design and engineering drawings services, and for checks on an existing structure before an extension, our structural evaluation service. Clearing an old building first? Read our demolition permit guide.
You need a building permit from the authority that controls the plot, based on an approved design. Before it is issued, the design needs NOCs from Civil Defence, DEWA, RTA and the telecom providers, and the master developer's NOC in a master community. Some sites also need demolition, excavation, shoring or groundwater discharge permits.
A registered engineering consultant submits the application on the owner's behalf, and a licensed contractor is named before the permit is issued. As the owner, you provide the ownership documents, appoint the consultant and contractor, and pay the authority fees.
Dubai Municipality typically issues a new building permit in 3 to 5 working days once the design and NOCs are approved, and Civil Defence approval typically takes 15 to 20 working days. Design, the developer review and comment rounds take most of the time, so plan the whole route in months.
It depends on the authority and the size of the building, because most permit fees are based on the built-up area. On DDA land, the final building permit is typically AED 1.00 per sq ft of built-up area. Our own fees are quoted after we check the plot.
No. Work can only start once the permit is issued and the plot has been demarcated. Work without a permit can be stopped and fined, and has to be regularised afterwards.
Yes. An extension or an extra floor needs a modification or addition permit, a structural check of the existing building and, in a master community, the developer's NOC.
Yes. We can prepare the drawings and coordinate the approvals as your design team, or work alongside a consultant and contractor you have already appointed.
On this page
Have a plot?
Send the plot number or affection plan and what you plan to build. We will tell you which authority approves it and the approvals it needs.
Guide
Who issues the permit for your plot, the stages from plot check to permit, and the documents for each.
Read more
Service
A new villa from empty plot to completion certificate: site plan, developer NOC, permit and inspections.
Read more
Service
Multi-storey and commercial building design prepared for authority approval.
Read more
Service
Building permits, modifications and NOCs for plots under Dubai Municipality.
Read more
Service
Developer, DEWA, Civil Defence and RTA NOCs tracked and followed up in one place.
Read more
Service
Final inspections, as-built drawings and service clearances to close the permit.
Read more
Guide
Shoring, excavation and groundwater permits for projects with a basement.
Read more
Service
Fire and life-safety drawings, submissions and inspections for new buildings.
Read more
Share the plot number or location, what you plan to build and its approximate size, and whether you already have a consultant or drawings. We will confirm the authority and the approvals your project needs.