Electrical loads, water, drainage, air-conditioning and fire systems decide whether a building can be connected and occupied. We design the MEP services and prepare the drawings and schedules that DEWA, Civil Defence and the permit authority review.
Architects decide what a building looks like. MEP engineers decide whether it can be switched on. In Dubai, the mechanical, electrical and plumbing design is reviewed by more parties than any other discipline, and it is the part most likely to hold up a connection or a completion certificate.
MEP design for approval has two jobs. It has to work, giving the right power, water, cooling, ventilation and drainage for the use. And it has to be presented in the form each reviewer expects: a load schedule for DEWA, fire system layouts for Civil Defence, and coordinated services drawings for the permit authority.
We design MEP services for new buildings, villas, extensions and fit-outs, and coordinate their review. The authorities issue the approvals and NOCs. We make sure what they receive is complete and consistent.
Lighting and power layouts, distribution board schedules, cable sizing, earthing, the connected load and maximum demand, and the main incoming arrangement.
Cold and hot water supply, tanks and pumps, sanitary drainage, rainwater drainage, and the connection to the public network or on-site system.
Cooling loads, air-conditioning system selection, ventilation and fresh air, kitchen and toilet extract, and equipment placement.
Fire alarm, firefighting, emergency lighting and voice evacuation where required, coordinated with the architectural fire strategy.
Data and telecom containment, CCTV and access control routes where they are part of the approval scope.
Equipment efficiency, lighting and water-saving measures that feed the Al Sa'fat compliance submission.
| Reviewer | What they look at | What we prepare |
|---|---|---|
| DEWA | Electricity and water connection, load, metering, substation and meter room requirements | Load schedules, single-line diagrams, meter room and incoming layouts, water connection details |
| Dubai Civil Defence | Fire alarm, firefighting systems, voice evacuation, gas distribution where present | Fire system layouts and schematics, to the UAE Fire and Life Safety Code of Practice |
| Permit authority (DM, Trakhees, DDA or free zone) | Coordinated services as part of the building or fit-out permit, drainage, insulation and code compliance | Full MEP drawing set coordinated with architecture and structure |
| Developer or landlord | Connection to base-build services, shaft and riser use, condenser locations, noise and appearance | Tenant MEP drawings, equipment schedules, base-build interface details |
The Dubai Building Code's Part G (incoming utilities) and Part K (villas) incorporate the relevant clauses of DEWA's electrical installation regulations, and Part H covers indoor environment, including ventilation. Our DEWA approvals and Civil Defence approvals pages explain each authority's process in detail.
DEWA's Building No Objection Certificate for electricity is the step that ties the electrical design to the building permit. DEWA's service guide states that only consultants and contractors enrolled with DEWA can submit it. The load submission typically includes the plot's total connected load, main and sub-main distribution board schedules, typical final distribution board schedules, and the maximum demand with the number of kWh meters at each level.
DEWA lists service times for these steps: two working days for the Building NOC, and for LV design approval one working day for loads up to 150 kW, two for 151–400 kW and three for 401 kW and above. These run from a complete submission. They don't include design time or any revisions.
Getting the numbers right: an inflated maximum demand can trigger a larger connection, or a substation, that the building doesn't need. An underestimated one causes problems at energisation. We calculate demand with diversity from the actual equipment and use. Our step-by-step DEWA approval guide covers the full sequence.
Dubai Civil Defence reviews fire alarm, firefighting and voice evacuation designs against the UAE Fire and Life Safety Code of Practice. It also has separate approval conditions for consultant drawings, contractor drawings, decoration drawings and gas distribution drawings.
Fire design has to match the architecture: hazard classification of each space, sprinkler and detector coverage, hose reel and hydrant positions, pump and tank sizing, and how the systems interface with lifts, smoke control and the alarm panel. When the layout changes, the fire drawings change too. We keep them in step so Civil Defence isn't reviewing an out-of-date plan. Our DCD checklist lists what inspectors typically check on site.
Alterations are often harder than new work, because the design has to fit services that are already there. Before designing, we establish what exists and what capacity is left:
Where the existing services aren't documented, a survey comes first. An accurate record of what is installed avoids designs that look right on paper but fail at connection or testing. Our as-built drawings service covers this.
We record the existing services (for alterations) and the equipment the use needs, and establish the design loads.
Our team · you
Layouts are drawn with the architect and structural engineer so shafts, ceilings, plant rooms and penetrations agree.
Design team
Load schedules go to DEWA and fire drawings to Civil Defence through enrolled or approved submitters, in the order the permit requires.
Enrolled consultant
The MEP set is included in the building or fit-out permit application with the NOCs received.
Registered consultant
We answer each reviewer's comments and keep all disciplines updated.
Consultant
The contractor installs to the approved drawings. Systems are tested and inspected before energisation, connection and the completion certificate.
Contractor · authorities
Usually yes. Most fit-outs change lighting, power, AC or fire systems, and the landlord and the authority will want to see how. Fire system drawings are often needed for Civil Defence.
DEWA's building NOC is submitted by enrolled consultants or contractors, not by owners directly. We prepare the load schedule and coordinate submission through an enrolled consultant.
DEWA uses it to size the connection and meters. It is part of the electricity NOC that the building permit depends on.
The UAE Fire and Life Safety Code of Practice is the reference Dubai Civil Defence uses for fire and life safety requirements.
Yes. Equipment efficiency, lighting, water fittings and controls all contribute to meeting the green building requirements for new buildings.
On this page
Need MEP drawings or a load schedule?
Tell us the property type, the authority if known and what is changing. We will outline the MEP scope.
Service
DEWA building NOCs, load approvals and electricity and water connections for new buildings, extensions and fit-outs in Dubai: documents, steps and common delays.
Read more
Service
DCD approval support in Dubai for fire and life-safety drawings, fire alarm and firefighting coordination, submissions, inspections and completion.
Read more
Service
Architectural, structural, MEP and fire drawing packages prepared to the Dubai Building Code and organised for DM, Trakhees, DDA, DCD and DEWA review.
Read more
Service
Fit-out approval for commercial and residential units in Dubai: landlord NOC, DM, DDA or Trakhees permit, Civil Defence, documents, process and completion.
Read more
Service
Rooftop solar on a Dubai villa, warehouse or building: DEWA Shams Dubai NOC, design approval, developer consent, structural checks and grid connection explained.
Read more
Guide
The useful starting point for an electrical application is an accurate description of connected equipment and the existing supply.
Read more
Guide
Inspection preparation should compare the completed work with the approved package and required evidence.
Read more
Guide
A U-value describes thermal transmittance through a building element.
Read more
Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.