Approval is the start, not the end. For clients who want one team from permit to handover, we offer execution services aligned with the approved drawings, inspections and completion requirements.
Each service is carried out under the approvals obtained for the project, with inspections and completion handled as part of the programme.
Apartment and villa fit-out carried out to the approved drawings: permit conditions, building rules, inspections and a handover with completion papers in order.
Learn moreOffice, shop and restaurant fit-out works built to the approved drawings, with Civil Defence inspections and the fit-out completion certificate planned in.
Learn moreVilla garden, hardscape, pergola and irrigation works carried out to the developer NOC and permit conditions, with inspections and closure planned in.
Learn moreSteel mezzanines, canopies and structures fabricated and erected to approved structural drawings, with registered contractors, inspections and completion.
Learn moreCoordinate furniture selection and supply with the layout, access and practical needs of your property. We help define the furnishing package alongside the wider fit-out scope.
Learn moreMany approval problems appear on site rather than on paper: a partition moved during construction, an extra socket on a different circuit, a pergola built taller than drawn. Each one can mean a failed inspection or a delayed completion certificate. When the same team is responsible for the approved design and the works, these deviations are caught early and either corrected or formally approved.
Prefer to use your own contractor? That's fine. Our permit and NOC services work independently of who builds.
Execution starts once the permit is issued. Our teams carry out residential fit-out for apartments and villas, commercial fit-out for offices, shops and restaurants, landscaping built to the approved garden plan, and steel contracting for mezzanines and structures. For furnished handovers, furniture supply and coordination sources and installs loose and fitted furniture to the approved layout.
Because the same team prepared the drawings, changes on site are checked against the approval before they are built. If a change is needed, a revision is prepared and approved first, so inspections and the completion certificate are not held up by work that doesn't match the permit.
Each service includes coordination of the inspections that apply, such as Civil Defence tests for fire systems and the authority's final inspection, followed by the documents needed for the completion certificate. You receive the as-built records, test certificates and warranties at handover. See how we work for the full sequence from brief to completion.
Share a few details and we will tell you which approvals apply, what documents you need and how we can help. There is no obligation.