DUBAI AUTHORITY APPROVALS

How we handle your approval project

A straightforward process built around your scope, property and next decision.

Two people reviewing printed architectural floor plans with a pencil and calculator

1. Understand the brief

Tell us what you plan to do, where the property is and what stage the project has reached. Existing drawings, management instructions and reviewer comments help establish the starting point.

We review the title deed or lease, the affection plan, any approved drawings and the developer's community rules. If the original drawings are missing, we arrange a measured survey and prepare as-built drawings so the design starts from the building as it actually is.

2. Define the responsibilities

Identify the required design, coordination and execution services. Agree the deliverables, exclusions, appointment structure and any specialist responsibilities before proceeding.

This becomes a written scope: which authorities and developers are involved, which drawings and documents we prepare, what you or your contractor provide, and what is excluded. It also notes the authority fees, which are paid separately and are shown as estimated ranges until the authority issues its invoice.

3. Prepare the information

Gather the applicant and property documents, develop the agreed technical information and coordinate interfaces. Maintain a single current drawing set and record outstanding decisions.

Architectural, structural and MEP drawings are coordinated with each other and checked against the Dubai Building Code, Al Sa'fat and the UAE Fire and Life Safety Code where they apply. Drawings are issued as PDF sets for submission and as AutoCAD DWG files for your records and your contractor.

4. Coordinate the relevant applications

Confirm the submission route and authorised applicant. Track comments and revisions against the actual scope; do not treat one consent as permission for unrelated works.

Developer NOCs usually come first, then the authority permit, with Civil Defence, DEWA or other NOCs requested in the order the authority needs them. When comments arrive, we revise the drawings, explain the changes and resubmit, keeping one record of what was approved at each stage.

5. Support the next project stage

Where included in the appointment, coordinate permitted site work, inspection preparation and completion documents. Review changes before they are built and preserve a useful handover record.

That can include carrying out the works through our execution services, preparing for Civil Defence and authority inspections, and assembling test certificates and as-built records for the completion certificate.

What you provide

  • Title deed, lease or Ejari, and the owner's consent if you are a tenant
  • Affection plan or site plan, where available
  • Any approved drawings, previous permits and completion certificates
  • The landlord's or developer's fit-out or modification guidelines
  • A short description of the work, with photos of the existing space

What we handle

  • Confirming which authorities and developers apply to the property
  • Surveys, drawings and calculations for the submission
  • Developer, landlord and utility NOCs in the right order
  • Submissions, tracking and responses to technical comments
  • Inspection preparation and completion documents, where included

Typical authority review periods

Once a complete submission is accepted, each authority's review usually takes the periods below. These are estimated ranges; comments, resubmissions and the time spent preparing drawings and NOCs come on top.

Authority or developerTypical review period
Dubai Municipality3 to 7 working days
Dubai Development Authority7 to 15 working days
Dubai Civil Defence15 to 20 working days
Trakhees8 to 20 days
JAFZA5 to 7 working days
Emaar3 to 5 working days
Nakheelabout 5 working days for standard reviews; extensive works take longer

Our guide on how long a building permit takes explains what affects these times.

What can slow an application down

  • Drawings that don't match the site, the approved set or each other
  • A missing developer, landlord or utility NOC
  • Changes to the scope after submission
  • Fire and escape layouts that need redesign after Civil Defence comments
  • Expired documents, such as a lease or trade licence

Most of these are avoided by settling the scope and checking the records at the start. See common building permit mistakes for more detail.

Questions before you start

The FAQ answers the questions we hear most, such as which authority applies and what to send for a quote. You can also read about our team, or send the property location and a short description through the project enquiry form and we will reply with the approvals that apply and a written scope.

LET’S TALK ABOUT YOUR PROJECT

A clear next step starts
with the right brief.

Tell us the location, property type and work you have in mind.

This form sends your enquiry to Dubai Authority Approvals by email. It does not submit an application to an authority. Please avoid identity documents in the initial enquiry; drawings can be shared once we reply.